Skip to content
My Address in Toronto
Address report

30 Unity Rd

An address in Greenwood-Coxwell, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.

Data as of Nov 7, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood and shoreline hazard areas.
  • 0 active development applications and 1 Committee of Adjustment application within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications1active within 250 m
Flood hazardOutsideTRCA mapping
Unity RdQuarry CrtTorbrick RdWoodfield RdValifor PlHiawatha RdWalpole AveHighfield RdSandstone LaneLount StShudell AveQueen Victoria StBoultbee AveSeymour AveGreenwood Ave1Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years4 permitsThis addressBuilding Permits · 5 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (5)
  • Building Permit Related(PS) · Inspection · Nov 17, 2025
    Plumbing - Proposal for replace detached garage with second floor addition · Permit 23 144847 PLB
  • Multiple Projects · Revision Issued · Jul 11, 2025
    Revision 1 - Revision for garage and second floor addition.Proposal for replace detached garage with second floor addition · Permit 23 144847 BLD
  • Building Permit Related(MS) · Permit Issued · Sep 27, 2024
    HVAC - Proposal for replace detached garage with second floor addition · Permit 23 144847 HVA
  • Multiple Projects · Cancelled · Sep 12, 2024
    Revision 01; Proposal to garage and second floor addition.Proposal for replace detached garage with second floor addition · Permit 23 144847 BLD
  • Multiple Projects · Inspection · Jan 10, 2024
    Proposal for replace detached garage with second floor addition · Permit 23 144847 BLD

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA32Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M1P0 of 28 above 0.01 ppmYour area · M1PNon Regulated Lead Sample · Mar 20, 2014 to Sep 4, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    20 Quarry Crt · 156 m · Committee of Adjustment · Minor variance · Deferred
    To alter the existing three-storey semi-detached dwelling by constructing a three-storey rear addition.
    File A0662/20TEY · submitted Jul 30, 2020

Development Applications; Committee of Adjustment Applications · 0 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 19, 2026This addressCollection calendar Thursday 1
Next recyclingNovember 12, 2026This addressSolid Waste Collection Schedule
City councillorPaula FletcherWard 14councillor_fletcher@toronto.ca · 416-392-4060

05Quick answers about 30 Unity Rd

Is 30 Unity Rd in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 30 Unity Rd?

0 active development applications within 250 metres. Source: Development Applications.

When is garbage day at 30 Unity Rd?

Collection calendar Thursday 1. Next garbage pickup: Nov 19, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

30 Unity Rd, Toronto — address report · My Address in Toronto