  • Outside TRCA flood hazard areas.
  • 3 planning applications within 250 m: two hearing on Dec 2, one under appeal after a refusal.
  • Lead in tap-water samples is higher than average in postal area M6J.
Building permits2in the last 5 years
Applications nearby3active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 12recycling and green bin
College StBathurst StMansfield AveGrace StClaremont StManning AveClinton StBeatrice StTreford PlHenderson AveGore StEuclid AvePalmerston AveNassau StMarkham St123Map data: City of Toronto (Toronto Centreline)College StMansfield AveBellwoods AveClaremont StManning AveClinton StHenderson AveGore StEuclid AvePalmerston Ave123Map data: City of Toronto (Toronto Centreline)
The red dot is 321 Manning Ave. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years2 permitsThis addressBuilding Permits · 7 on record

2 building permits in the last 5 years, for 1 project. Together they added 1 new home. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 4 projects from 7 permits
  • Garage · completed Jan 27, 2023
    Proposal to reconstruct a rear detached garage. · Permit 20 225263
  • Alternative Solution · completed Nov 8, 2021
    This Alternative Solution addresses the requirements related to the fire department access route to the garage building located at 321 Manning Avenue. · Permit 21 180984
  • Addition, deck or porch and more · completed Feb 15, 2023
    Proposal for second and third floor additions with interior alterations to an existing two storey single family dwelling. Scope of work includes second floor balcony with a third floor roof deck. · 3 permits in this project (such as building, plumbing and heating) · Permit 20 225230
  • Underpinning · completed Dec 7, 2020
    Underpinning existing basement · 2 permits in this project (such as building, plumbing and heating) · Permit 20 209490

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M6J4.8% of tests above Ontario's limitYour area · M6JNon Regulated Lead Sample · 394 tests, Jan 21, 2014 to Oct 5, 2026

In postal area M6J, 19 of 394 home tap-water samples (4.8%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6J is higher than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 32 samples here (8.1%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

3 active planning applications within 250 m (about a 3-minute walk): two hearing on Dec 2, one under appeal after a refusal. That's about typical for Toronto (the typical address has 1).

Dec
2
Nearby · 129 mCommittee of Adjustment hearing: 269 Claremont St9:30 a.m. · Committee of Adjustment · Minor variance · File A0698/26TEY
Dec
2
Nearby · 209 mCommittee of Adjustment hearing: 267 Palmerston Ave9:30 a.m. · Committee of Adjustment · Minor variance · File A0689/26TEY
  1. 1
    269 Claremont St · 129 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    A public hearing is set for Dec 2, 2026 at 9:30 a.m.. Neighbours can send comments or speak at the hearing.

    To alter the existing two-storey semi-detached dwelling by constructing a partial rear second storey addition and rooftop terrace above the rear one-storey portion of the dwelling.
    File A0698/26TEY · submitted Sep 29, 2026
  2. 2
    267 Palmerston Ave · 209 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    A public hearing is set for Dec 2, 2026 at 9:30 a.m.. Neighbours can send comments or speak at the hearing.

    To legalize and alter the existing rear second and third storey cantilevered addition on the existing three-storey semi-detached dwelling, by relocating the north wall of the addition within the property line (to remove the existing…
    File A0689/26TEY · submitted Sep 15, 2026
  3. 3
    269 Euclid Ave · 212 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Dec 1, 2021. It has been appealed to the Toronto Local Appeal Body (TLAB), which will hold its own hearing and make the final decision.

    To alter the existing two-storey detached dwelling by extending the south side and rear areas of the ground floor and second level and to construct a complete third storey addition above. Also, to construct a front covered porch, a front…
    File A0960/21TEY · submitted Jul 23, 2021
Short-term rentals nearby18 registered homesWithin 250 mShort Term Rentals Registration

18 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingThursdaysThis addressSolid Waste Collection Schedule

Next: November 12: recycling and green bin. November 19: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.

City councillorDianne SaxeWard 11Councillor_Saxe@toronto.ca · 416-392-4009

05Quick answers about 321 Manning Ave

Is 321 Manning Ave in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 321 Manning Ave?

There are 3 active planning applications within 250 metres (two hearing on Dec 2, one under appeal after a refusal). The closest is at 269 Claremont St, 129 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 321 Manning Ave been renovated?

Yes. The City has 7 building permits on record, 2 in the last 5 years. Source: Building Permits.

Is 321 Manning Ave a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 321 Manning Ave?

Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 19, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Manning Avenue, north of College Street
1930 · 140 m awayManning Avenue, north of College StreetCity of Toronto Archives, Fonds 1244, Item 1962
Manning Avenue, looking north from College Street
1944 · 140 m awayManning Avenue, looking north from College StreetCity of Toronto Archives, Fonds 1244, Item 7375
Trinity College; St. Hilda's College (1888-1889), Euclid Ave., w. side, s. of Robinson St.
1949 · 163 m awayTrinity College; St. Hilda's College (1888-1889), Euclid Ave., w. side, s. of Robinson St. Courtesy of Toronto Public Library
View of College Street looking west across Clinton Street
1983 · 186 m awayView of College Street looking west across Clinton StreetCity of Toronto Archives, Fonds 1526, File 71, Item 97
College St, west of Clinton St, (Way Department)
1936 · 186 m awayCollege St, west of Clinton St, (Way Department)City of Toronto Archives, Fonds 16, Series 71, Item 11493
Clinton Street Methodist Church, Clinton St., west side, north of College St., Toronto, Ont.
1890 · 186 m awayClinton Street Methodist Church, Clinton St., west side, north of College St., Toronto, Ont. Courtesy of Toronto Public Library
260 Euclid Avenue
1938 · 205 m away260 Euclid AvenueCity of Toronto Archives, Fonds 200, Series 372, Subseries 33, Item 349
260 Euclid Avenue
1938 · 205 m away260 Euclid AvenueCity of Toronto Archives, Fonds 200, Series 372, Subseries 33, Item 371
College Street Baptist Church and Palmerston Boulevard, Toronto, Canada
1910 · 233 m awayCollege Street Baptist Church and Palmerston Boulevard, Toronto, Canada Courtesy of Toronto Public Library

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

321 Manning Ave, Toronto M6J: permits, flood risk and what's planned nearby · My Address in Toronto