Skip to content
My Address in Toronto
Address report

33 Hahn Pl

A registered apartment building built in 1980 with a RentSafe score of 84, outside TRCA flood and shoreline hazard areas, with 10 active development applications within 250 metres.

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • RentSafe evaluation score of 84 out of 100 (evaluated Jul 29, 2025).
  • No fire code violations in open inspections.
  • Outside TRCA flood and shoreline hazard areas.
  • 10 active development applications and 4 Committee of Adjustment applications within 250 m.
RentSafe score84out of 100
Fire code violations0in open inspections
Applications14active within 250 m
Flood hazardOutsideTRCA mapping
The EsplanadeLongboat AveHahn PlDouville CrtPrincess StScadding AveAitken PlPortneuf CrtMill StTrinity StBerkeley StF G Gardiner Xy EF G Gardiner Xy WParliament StLake Shore Blvd ELower Sherbourne StFront St E123456789101112Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluation84 / 100This addressApartment Building Evaluation · evaluated Jul 29, 2025
Building8 storeys · 135 units · built 1980This addressApartment Building Evaluation
Fire code inspectionsNo violations in open inspectionsThis addressResidential Fire Inspection Results · last opened May 7, 2026
Building orders and noticesNone open (1 closed)This addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 5 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (5)
  • Garage Repair/Reconstruction · Closed · Aug 17, 2021
    PROPOSED: 165 sq.m of concrete slab on-grade replacement110 sq.m of localized concrete slab repair. · Permit 21 174320 BLD
  • Interior Alterations · Closed · Apr 13, 2018
    Change 1-bedroom apartment unit to 2-bedroom unit for recovery care.Interior Alternation, extend bathroom space for wheel chair, change Kitchen to supervision workstation · Permit 17 276366 BLD
  • Building Permit Related(PS) · Closed · Apr 13, 2018
    Plumbing - Change 1-bedroom apartment unit to 2-bedroom unit for recovery care.Interior Alternation, extend bathroom space for wheel chair, change Kitchen to supervision workstation · Permit 17 276366 PLB
  • Other(PS) · Permit Issued · Sep 19, 2011
    Proposal to install storage tanks in connection with solar panels. See 11-256870 DST. · Permit 11 256879 PSA
  • Install/Alter HVAC - only · Closed - Dormant · Nov 16, 1999
    H.V.A.C. ALTER H.V.A.C. SYSTEM ON PORTION OF GROUND FLOOR. SEE 412835 AND 420853 - COST INCLUDED EDC · Permit 99 108373 HVA

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA62Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M5A4 of 104 above 0.01 ppmYour area · M5ANon Regulated Lead Sample · May 21, 2014 to Oct 15, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    281 Front St E · 36 m · Official Plan / Rezoning · Under Review
    The application proposes to amend the Official Plan and Zoning By-law to permit a mixed-used building consisting of two residential towers (54- and 50-storeys), 1,065 residential dwelling units, 643 square metres of retail space on the…
    File 26 163623 STE 13 OZ · submitted May 20, 2026 · City record
  2. 2
    250 Front St E · 111 m · Site Plan · Under Review
    for Corktown station
    File 23 142019 STE 13 SA · submitted May 5, 2023 · City record
  3. 3
    351 King St E · 189 m · Official Plan / Rezoning · Council Approved
    The application to amend the Zoning By-law proposes two new buildings for the property at 333-351 King Street East & 200 Front Street East. The proposed development includes a 37-storey residential building (140 metres tall) on the west…
    File 18 196225 STE 28 OZ · submitted Jul 18, 2018 · City record
  4. 4
    300 King St E · 198 m · Official Plan / Rezoning · OMB Approved
    This application proposes a 46-storey (158.2 metres including mechanical penthouse) mixed-use building with 478 dwelling units and 663 square metres of retail at grade.
    File 21 235932 STE 13 OZ · submitted Nov 9, 2021 · City record
  5. 5
    298 King St E · 207 m · Official Plan / Rezoning · OMB Approved
    This application proposes a 46-storey (158.2 metres including mechanical penthouse) mixed-use building with 478 dwelling units and 663 square metres of retail at grade.
    File 21 235932 STE 13 OZ · submitted Nov 9, 2021 · City record
  6. 6
    298 King St E · 207 m · Site Plan · OMB Appeal
    Site Plan Application for a 42-storey (139.90 metres including mechanical penthouse) mixed-use building with 1,188 square metres of commercial uses at grade and 449 dwelling units.
    File 23 188669 STE 13 SA · submitted Aug 14, 2023 · City record
  7. 7
    56 Berkeley St · 209 m · Official Plan / Rezoning · OMB Approved
    This application proposes a 46-storey (158.2 metres including mechanical penthouse) mixed-use building with 478 dwelling units and 663 square metres of retail at grade.
    File 21 235932 STE 13 OZ · submitted Nov 9, 2021 · City record
  8. 8
    296 King St E · 213 m · Official Plan / Rezoning · OMB Approved
    This application proposes a 46-storey (158.2 metres including mechanical penthouse) mixed-use building with 478 dwelling units and 663 square metres of retail at grade.
    File 21 235932 STE 13 OZ · submitted Nov 9, 2021 · City record
  9. 9
    58 Berkeley St · 226 m · Official Plan / Rezoning · OMB Approved
    This application proposes a 46-storey (158.2 metres including mechanical penthouse) mixed-use building with 478 dwelling units and 663 square metres of retail at grade.
    File 21 235932 STE 13 OZ · submitted Nov 9, 2021 · City record
  10. 10
    60 Berkeley St · 229 m · Official Plan / Rezoning · OMB Approved
    This application proposes a 46-storey (158.2 metres including mechanical penthouse) mixed-use building with 478 dwelling units and 663 square metres of retail at grade.
    File 21 235932 STE 13 OZ · submitted Nov 9, 2021 · City record
  11. 11
    33 Parliament St · 111 m · Committee of Adjustment · Consent (severance) · Conditional Consent
    To obtain consent to sever the property into three lots with a strata severance and to create various easements/rights-of-ways within the 33-storey mixed-use building which is currently under construction.
    File B0019/25TEY · submitted Mar 26, 2025
  12. 12
    31 Parliament St · 123 m · Committee of Adjustment · Consent (severance) · Conditional Consent
    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.
    File B0058/25TEY · submitted Sep 23, 2025

Development Applications; Committee of Adjustment Applications · 7 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 18, 2026This addressCollection calendar Wednesday 1
Next recyclingNovember 11, 2026This addressSolid Waste Collection Schedule
City councillorAusma MalikWard 10Councillor_Malik@toronto.ca · 416-392-4044

05Quick answers about 33 Hahn Pl

Is 33 Hahn Pl in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

Does 33 Hahn Pl have open fire code violations?

No. The City's fire inspection records show no violations in open inspections. Source: Residential Fire Inspection Results.

What is being built near 33 Hahn Pl?

10 active development applications within 250 metres, the closest at 281 Front St E (36 m). Source: Development Applications.

When is garbage day at 33 Hahn Pl?

Collection calendar Wednesday 1. Next garbage pickup: Nov 18, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Parliament St., looking n. across Mill St.
Parliament St., looking n. across Mill St. , 1907. Courtesy of Toronto Public Library. 99 m away.
Corner of Parliament St. and Mill St., looking east
Corner of Parliament St. and Mill St., looking east, 1972. City of Toronto Archives, Fonds 2032, Series 841, File 6, Item 8. 99 m away.
Parliament St., looking s. across Mill St.
Parliament St., looking s. across Mill St. , 1907. Courtesy of Toronto Public Library. 99 m away.
Lake Shore Boulevard and Parliament looking north-east
Lake Shore Boulevard and Parliament looking north-east, 1980. City of Toronto Archives, Fonds 200, Series 1465, File 142, Item 41. 226 m away.
Coal chargers for vertical retorts, Station A, Front Street East and Berkeley Street
Coal chargers for vertical retorts, Station A, Front Street East and Berkeley Street, 1923. City of Toronto Archives, Fonds 1034, Item 756. 232 m away.
West Galley, vertical retorts, Station A, interior, Front Street East and Berkeley Street
West Galley, vertical retorts, Station A, interior, Front Street East and Berkeley Street, 1923. City of Toronto Archives, Fonds 1034, Item 774. 232 m away.
Waste Heat Boilers, Station A, Front Street East and Berkeley Street
Waste Heat Boilers, Station A, Front Street East and Berkeley Street, 1923. City of Toronto Archives, Fonds 1034, Item 762. 232 m away.
Dalton's Warehouse, Front Street East and Berkeley Street
Dalton's Warehouse, Front Street East and Berkeley Street, 1975. City of Toronto Archives, Fonds 124, File 3, Item 38. 232 m away.
Primary condensers, Station A, Front Street East and Berkeley Street
Primary condensers, Station A, Front Street East and Berkeley Street, 1923. City of Toronto Archives, Fonds 1034, Item 754. 232 m away.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

33 Hahn Pl, Toronto — address report · My Address in Toronto