333 Bloor St E
333 Bloor St E is in North St.James Town, on the City's Heritage Register. It's outside TRCA flood hazard areas and there are 3 planning applications nearby (one under review, one approved, one refused).
Data as of Nov 8, 2026 · Every item lists its source
- 24 building permits in the last 5 years.
- It is individually designated under the Ontario Heritage Act (Part IV).
- Outside TRCA flood hazard areas.
- 3 planning applications within 250 m: one under review, one approved, one refused.
03The building
24 building permits in the last 5 years, for 12 projects. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It is individually designated under the Ontario Heritage Act (Part IV). Changes to its heritage features need a heritage permit from the City.
Permit history: 12 projects from 25 permits (most recent 25 of 113)
- Re-Roofing/Re-Cladding · completed Jan 14, 2026
Proposal for localized remedial repair to exterior stone masonry walls above 10th Floor balcony · Permit 25 206096 - Interior Alterations · completed Jan 12, 2026
Proposal for localized stone masonry repairs to the existing building. · Permit 24 187370 - Building work · completed Aug 27, 2025
Proposal for replacement of the exterior ramp and improvements to the exterior stairs and entrance doors in order to meet with latest accessible requirements. · Permit 24 210605 - Electromagnetic Locks · completed Jan 29, 2025
Proposed replacement of three maglocks. · Permit 24 229640 - Interior Alterations · completed Feb 24, 2025
Proposal for interior alterations to the East Suite of the Ground Floor of an existing office to serve as a new broadcast studio space - Rogers Communications Canada · 3 permits in this project (such as building, plumbing and heating) · Permit 24 159030 - Interior Alterations · completed Aug 29, 2024
Proposal for interior alterations to existing retail space in an existing commercial building - Rogers Communications Canada Inc · 2 permits in this project (such as building, plumbing and heating) · Permit 23 208691 - Fire Alarm · completed Oct 6, 2025
Replace the existing fire alarm CACF, FACP panels, add extra speaker/strobes in corridor and public WC ; upgrade entire fire alarm system. · Permit 22 219495 - Interior Alterations · completed Sep 10, 2025
REV 01: Proposal to replace two existing CRAC units with the new; add two new racks.Proposal to demolish a wall and closet, expand the technician office to be part of the data hub room in Basement… · 2 permits in this project (such as building, plumbing and heating) · Permit 21 213177 - Interior Alterations · completed Feb 6, 2025
Revision - Expansion of project scope area to sub-basement level. Demolition existing chiller plant and installation of new heat recovery chiller plant in sub-basement level with associated… · 7 permits in this project (such as building, plumbing and heating) · Permit 22 110097 - Electromagnetic Locks · completed Oct 6, 2023
REVISION - addition of only 1 maglock and not 2 as previously proposedProposal to disconnect 3 maglocks and reconnect to new power supplies on the ground floor of an existing office building. · 2 permits in this project (such as building, plumbing and heating) · Permit 21 138091 - Interior Alterations · completed Mar 18, 2022
Proposal for interior alterations to an existing retail store tenant - 'Rogers/Fido'. Unit #1 on the ground floor level. · 2 permits in this project (such as building, plumbing and heating) · Permit 21 246604 - Interior Alterations · inspection · issued Dec 13, 2021
Proposal for interior alterations on the sub basement level for TSSA remedial work to the diesel fuel system. · 2 permits in this project (such as building, plumbing and heating) · Permit 21 245988
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4W, 1 of 82 home tap-water samples (1.2%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4W is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (6.1%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
3 active planning applications within 250 m (about a 3-minute walk): one under review, one approved, one refused. That's about typical for Toronto (the typical address has 1).
- 1235 Bloor St E · 79 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on Nov 4, 2026.
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to…File A0664/26TEY · submitted Aug 31, 2026 - 2350 Bloor St E · 150 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposal to construct a 63-storey mixed-use building on the subject site. The existing six-storey office building will be replaced. Approximately 486 square metres of retail is proposed at grade, with approximately 8,259 square metres of…File 22 172659 STE 11 SA · submitted Jul 6, 2022 · City record - 32 Elm Ave · 169 m awayCondominium: a request to divide a building into condominium units
It has been approved.
Draft Plan of Condominium for 819 units.File 21 214202 STE 11 CD · submitted Sep 17, 2021 · City record
10 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 333 Bloor St E
Is 333 Bloor St E in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 333 Bloor St E?
There are 3 active planning applications within 250 metres (one under review, one approved, one refused). The closest is at 235 Bloor St E, 79 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 333 Bloor St E been renovated?
Yes. The City has 113 building permits on record, 24 in the last 5 years. Source: Building Permits.
Is 333 Bloor St E a heritage property?
Yes. It is individually designated under the Ontario Heritage Act (Part IV). Changes to its heritage features need a heritage permit from the City. Source: Heritage Register.
When is garbage day at 333 Bloor St E?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives





![Corner of Jarvis St. and Charles St. [?]](/photos/588342-t.jpg)



Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location