34 Highview Cres is in Corso Italia-Davenport. It's outside TRCA flood hazard areas and there are 4 planning applications nearby (all approved).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 4 planning applications within 250 m: all approved.
Building permits0in the last 5 years
Applications nearby4active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 12recycling and green bin
St Clair AveOakwood AveNorthcliffe BlvdWinona DrBenson AveRegal RdLauder AveMount Royal AveThome CresRosemount AveSpringmount AveAlberta AveBurlington CresGlenholme AveTyrrel Ave1234Map data: City of Toronto (Toronto Centreline)St Clair AveOakwood AveRegal RdThome CresSpringmount AveBurlington CresBiggar AveRosemount AveGlenholme AveLauder Ave1234Map data: City of Toronto (Toronto Centreline)
The red dot is 34 Highview Cres. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 2 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 2 projects from 2 permits
  • Garage · completed Oct 30, 2026
    To construct a detached garage at the rear yard · Permit 08 216978
  • Demolition · completed Aug 22, 2018
    To demolish a garage at rear, existing parking space to be maintained · Permit 08 210351

04Risks and the ground

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M6H2.4% of tests above Ontario's limitYour area · M6HNon Regulated Lead Sample · 538 tests, Jan 6, 2014 to Oct 20, 2026

In postal area M6H, 13 of 538 home tap-water samples (2.4%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6H is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 25 samples here (4.6%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

4 active planning applications within 250 m (about a 3-minute walk): all approved. That's about typical for Toronto (the typical address has 1).

  1. 1
    916 St Clair Ave W · 211 m away
    Condominium: a request to divide a building into condominium units

    It has been approved.

    Draft Plan of Standard Condominium for 173 units.
    File 21 230249 STE 09 CD · submitted Oct 25, 2021 · City record
  2. 2
    912 St Clair Ave W · 220 m away
    Condominium: a request to divide a building into condominium units

    It has been approved.

    Draft Plan of Standard Condominium for 173 units.
    File 21 230249 STE 09 CD · submitted Oct 25, 2021 · City record
  3. 3
    910 St Clair Ave W · 224 m away
    Condominium: a request to divide a building into condominium units

    It has been approved.

    Draft Plan of Standard Condominium for 173 units.
    File 21 230249 STE 09 CD · submitted Oct 25, 2021 · City record
  4. 4
    908 St Clair Ave W · 236 m away
    Condominium: a request to divide a building into condominium units

    It has been approved.

    Draft Plan of Standard Condominium for 173 units.
    File 21 230249 STE 09 CD · submitted Oct 25, 2021 · City record
Short-term rentals nearby4 registered homesWithin 250 mShort Term Rentals Registration

4 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingThursdaysThis addressSolid Waste Collection Schedule

Next: November 12: recycling and green bin. November 19: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.

City councillorAlejandra BravoWard 9Councillor_Bravo@toronto.ca · 416-392-7012

05Quick answers about 34 Highview Cres

Is 34 Highview Cres in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 34 Highview Cres?

There are 4 active planning applications within 250 metres (all approved). The closest is at 916 St Clair Ave W, 211 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 34 Highview Cres been renovated?

Yes. The City has 2 building permits on record, 0 in the last 5 years. Source: Building Permits.

Is 34 Highview Cres a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 34 Highview Cres?

Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 19, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

34 Highview Cres, Toronto M6H: permits, flood risk and what's planned nearby · My Address in Toronto