357 Clinton St
An address in Palmerston-Little Italy, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
- 0 active development applications and 5 Committee of Adjustment applications within 250 m.
01The building
Recent permits (1)
- Other(SR) · Permit Issued · Nov 3, 2020
reconstruct rear portion of existing building · Permit 20 197822 BLD
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
- 1614 Manning Ave · 129 m · Committee of Adjustment · Minor variance · OMB AppealTo legalize and maintain the existing coach house at the rear of the existing 2½-storey semi-detached dwelling. Also, to convert a portion of the coach house into a two-car garage, with access to the rear lane way.File A0423/14TEY · submitted Apr 28, 2014
- 2679 Euclid Ave · 199 m · Committee of Adjustment · Minor variance · ApprovedTo alter the existing two-and-one-half storey semi-detached dwelling by constructing a rear one-storey ground floor addition with a second storey terrace above, and a new rear ground floor deck with stairs. The existing rear walkout…File A0621/26TEY · submitted Jun 16, 2026
- 3131 Jersey Ave · 237 m · Committee of Adjustment · Minor variance · PostponedTo construct a new three-storey seven-unit semi-detached apartment building (including a third storey mezzanine level), with a covered front porch with stairs, and a mechanical penthouse enclosure (including rooftop access, above the…File A0739/26TEY · submitted Oct 19, 2026
- 4131 Jersey Ave · 237 m · Committee of Adjustment · Consent (severance) · PostponedTo obtain consent to sever the property into two residential lots.File B0065/26TEY · submitted Oct 19, 2026
- 5131 Jersey Ave · 237 m · Committee of Adjustment · Minor variance · PostponedTo construct a new three-storey seven-unit semi-detached apartment building (including a third storey mezzanine level), with a covered front porch with stairs, and a mechanical penthouse enclosure (including rooftop access, above the…File A0737/26TEY · submitted Oct 19, 2026
Development Applications; Committee of Adjustment Applications · 8 registered short-term rentals within 250 m.
04City services
05Quick answers about 357 Clinton St
Is 357 Clinton St in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 357 Clinton St?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 357 Clinton St?
Collection calendar Thursday 1. Next garbage pickup: Nov 19, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives





Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location