364 Huron St
364 Huron St is in University. It added a laneway suite in 2025, it's outside TRCA flood hazard areas and there are 9 planning applications nearby (six under review, two approved, one waiting for a hearing date).
Data as of Nov 8, 2026 · Every item lists its source
- 2 open building orders from the City.
- Added a laneway suite (completed Jul 2025).
- Outside TRCA flood hazard areas.
- 9 planning applications within 250 m: six under review, two approved, one waiting for a hearing date.
03The building
20 building permits in the last 5 years, for 5 projects. This includes a laneway suite, completed Jul 2025. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 5 projects from 22 permits
- Interior Alterations · revision issued · issued Apr 22, 2026
REV01: Proposed revision interior partition alterationProposal to create 3 residential units on the third floor of the mixed use building. · 4 permits in this project (such as building, plumbing and heating) · Permit 26 106199 - Interior Alterations · inspection · issued Nov 7, 2025
Proposed to add a mezzanine ( previous permit : 23 232887 ) · Permit 25 209369 - Demolition · completed Nov 3, 2025
Proposal to demolish exisiting building to construct new building · Permit 24 116810 - Laneway suiteNew home · completed Jul 15, 2025
Building height increaseProposed construction of a laneway house. · 4 permits in this project (such as building, plumbing and heating) · Permit 23 234047 - New Building · completed Jul 17, 2025
Rev 04: basement walkout and ground floor accessRev 03: revision to basement walkoutProposed 3 storey mixed use building with take out kitchens on the ground floor and residential on the second and… · 12 permits in this project (such as building, plumbing and heating) · Permit 23 232887
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M5S, 0 of 167 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5S is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (3.0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
9 active planning applications within 250 m (about a 3-minute walk): six under review, two approved, one waiting for a hearing date. That's more than at most Toronto addresses (the typical address has 1).
- 115 Glen Morris St · 84 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To alter the development standards for the eight-storey residential apartment building (approved under Site Specific Zoning By-Laws 879-2009(OMB) and 880-2009(OMB)), increasing the height (from 25.5 m to 26.1 m), and reducing the rear…File A0747/26TEY · submitted Oct 21, 2026 - 2300 Bloor St W · 170 m awayCondominium: a request to divide a building into condominium units
It has been approved.
Draft Plan of Standard Condominium to create 339 residential units and 1 retail unit within a 34-storey building.File 26 130612 STE 11 CD · submitted Mar 17, 2026 · City record - 3316 Bloor St W · 224 m awaySite Plan: City review of the design and layout of a new building
City planners approved the site plan, with conditions to meet before a building permit.
Site Plan application for a 36-storey mixed use building including at grade commercial space and 499 residential units.File 16 182137 STE 20 SA · submitted Jun 28, 2016 · City record - 4320-326 Bloor St W · 242 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Approval for a 37-storey mixed-use building atop an 8-storey base building, having a non-residential gross floor area of 627.9 square metres and a residential gross floor area of 31,231.27 square metres. A total of 366…File 21 245851 STE 11 SA · submitted Dec 7, 2021 · City record - 5320-326 Bloor St W · 242 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
Zoning By-law amendment to permit a 36-storey mixed-use building, containing 345 dwelling units and 250 square metres of non-residential gross floor area.File 21 234506 STE 11 OZ · submitted Nov 5, 2021 · City record - 6320-326 Bloor St W · 242 m awaySubdivision: a request to divide land into new lots and streets
City planners are reviewing it. Residents can comment before a decision is made.
Draft Plan of Subdivision for 1 development block.File 21 234509 STE 11 SB · submitted Nov 5, 2021 · City record - 7320 Bloor St W · 247 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
Zoning By-law amendment to permit a 36-storey mixed-use building, containing 345 dwelling units and 250 square metres of non-residential gross floor area.File 21 234506 STE 11 OZ · submitted Nov 5, 2021 · City record - 8320 Bloor St W · 247 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Approval for a 37-storey mixed-use building atop an 8-storey base building, having a non-residential gross floor area of 627.9 square metres and a residential gross floor area of 31,231.27 square metres. A total of 366…File 21 245851 STE 11 SA · submitted Dec 7, 2021 · City record - 9320 Bloor St W · 247 m awaySubdivision: a request to divide land into new lots and streets
City planners are reviewing it. Residents can comment before a decision is made.
Draft Plan of Subdivision for 1 development block.File 21 234509 STE 11 SB · submitted Nov 5, 2021 · City record
5 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 364 Huron St
Is 364 Huron St in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 364 Huron St?
There are 9 active planning applications within 250 metres (six under review, two approved, one waiting for a hearing date). The closest is at 15 Glen Morris St, 84 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 364 Huron St been renovated?
Yes. The City has 22 building permits on record, 20 in the last 5 years. They include a laneway suite. Source: Building Permits.
Is 364 Huron St a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 364 Huron St?
Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.