Skip to content
My Address in Toronto
Address report

38 Langbourne Pl

38 Langbourne Pl is in Banbury-Don Mills. It's outside TRCA flood hazard areas and there is 1 planning application nearby (refused, now under appeal).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 1 planning application within 250 m: refused, now under appeal.
Building permits1in the last 5 years
Applications nearby1active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 11garbage, green bin and yard waste
The DonwayLawrence AveTalwood DrHemford CresLangbourne PlNorden CresGladwyn RdDuncairn RdJocelyn Cres1Map data: City of Toronto (Toronto Centreline)The DonwayDuncairn RdBelton RdLangbourne PlTremont CresGladwyn RdJocelyn Cres1Map data: City of Toronto (Toronto Centreline)
The red dot is 38 Langbourne Pl. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years1 permitThis addressBuilding Permits · 1 on record

1 building permit in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 1 project from 1 permit
  • Back Water Valve (Sewer only) · completed Aug 30, 2024
    Proposal to install a backwater valve on the exterior of the building · Permit 24 198045

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M3B0% of tests above Ontario's limitYour area · M3BNon Regulated Lead Sample · 53 tests, Jan 6, 2014 to Oct 2, 2026

In postal area M3B, 0 of 53 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M3B is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 0 samples here (0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

1 active planning application within 250 m (about a 3-minute walk): refused, now under appeal. That's about typical for Toronto (the typical address has 1).

  1. 1
    10 Langbourne Pl · 151 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Oct 1, 2015. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    To construct a new two-storey detached dwelling with an integral garage. The existing dwelling would be demolished.
    File A0768/15NY · submitted Aug 17, 2015
Short-term rentals nearby0 registered homesWithin 250 mShort Term Rentals Registration

No homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). Most Toronto addresses (73%) have at least one short-term rental nearby.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingWednesdaysThis addressSolid Waste Collection Schedule

Next: November 11: garbage, green bin and yard waste. November 18: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorJon BurnsideWard 16Councillor_Burnside@toronto.ca · 416-397-9256

05Quick answers about 38 Langbourne Pl

Is 38 Langbourne Pl in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 38 Langbourne Pl?

There is 1 active planning application within 250 metres (refused, now under appeal). The closest is at 10 Langbourne Pl, 151 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 38 Langbourne Pl been renovated?

Yes. The City has 1 building permit on record, 1 in the last 5 years. Source: Building Permits.

Is 38 Langbourne Pl a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 38 Langbourne Pl?

Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 11, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

38 Langbourne Pl, Toronto M3B: permits, flood risk and what's planned nearby · My Address in Toronto