3900 Jane St
3900 Jane St is in Glenfield-Jane Heights. It's outside TRCA flood hazard areas and there are 3 planning applications nearby (two approved by the tribunal, one under review).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 3 planning applications within 250 m: two approved by the tribunal, one under review.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 2 projects from 3 permits
- Interior Alterations · completed Nov 6, 2017
Construct interior alterations for "180 Smoke" (70m2) · 2 permits in this project (such as building, plumbing and heating) · Permit 17 210221 - Addition(s) · completed Jun 8, 2026
**demo & replace gas · Permit 99 251350
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M3N, 0 of 10 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). That's too few samples to compare with the rest of the city. Health Canada recommends a stricter limit of 5 micrograms per litre: 0 samples here (0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
3 active planning applications within 250 m (about a 3-minute walk): two approved by the tribunal, one under review. That's about typical for Toronto (the typical address has 1).
- 11 York Gate Blvd · 129 m awaySite Plan: City review of the design and layout of a new building
The Ontario Land Tribunal (formerly the OMB) approved it.
**The OLT issued the Final Order on the ZBA appeal (OLT-23-000969) and adjourned the site plan appeal (OLT-23-000970). The site plan appeal is currently in the OLT's 'closed file status' list as the applicant has not made any progress.…File 22 124982 WET 07 SA · submitted Mar 21, 2022 · City record - 21 York Gate Blvd · 129 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
The Ontario Land Tribunal (formerly the OMB) approved it.
Construction of a 22-storey purpose-built rental residential apartment building in the northwest portion of the property.File 22 116509 WET 07 OZ · submitted Feb 23, 2022 · City record - 31911 Finch Ave W · 199 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Control Application to facilitate Phase 1 of the proposed redevelopment of the Jane Finch Mall. Phase 1 incorporates the lands fronting on Finch Avenue West. Six new buildings are proposed, with tower heights ranging from from…File 23 184424 WET 07 SA · submitted Aug 4, 2023 · City record
No homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). Most Toronto addresses (73%) have at least one short-term rental nearby.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 3900 Jane St
Is 3900 Jane St in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 3900 Jane St?
There are 3 active planning applications within 250 metres (two approved by the tribunal, one under review). The closest is at 1 York Gate Blvd, 129 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 3900 Jane St been renovated?
Yes. The City has 3 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 3900 Jane St a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 3900 Jane St?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives




Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location