398 Main St
398 Main St is in Woodbine-Lumsden. It's outside TRCA flood hazard areas and there are 4 planning applications nearby (three approved, one under review).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 4 planning applications within 250 m: three approved, one under review.
03The building
1 building permit in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 4 permits
- Addition, garage and more · revision issued · issued Oct 7, 2019
revision to permit 18 253053 bld 00 SR Increase size of rear addition & add rear balcony; and add rear detached garageProposed two storey addition at rear, interior alterations,… · 4 permits in this project (such as building, plumbing and heating) · Permit 18 253053
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4C, 21 of 851 home tap-water samples (2.5%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4C is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 58 samples here (6.8%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
4 active planning applications within 250 m (about a 3-minute walk): three approved, one under review. That's about typical for Toronto (the typical address has 1).
- 190 Eastdale Ave · 214 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Approval for a 41-storey (129.6 metres in height excluding the 6 storey mechnical penthouse) residential development with a six-storey podium including 547 dwelling units of which 35 are rental replacement and 11 are affordable…File 24 178208 STE 19 SA · submitted Jul 10, 2024 · City record - 290 Eastdale Ave · 214 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City Council approved it.
Zoning By-law Amendment for a 40-storey (126 metres plus 6 metre MPH) high-rise residential development, with a 6-storey podium. The proposal will contain 535 dwelling unit and comprise of 38,806 m2 residential gross floor area, two…File 24 123646 STE 19 OZ · submitted Mar 8, 2024 · City record - 390 Eastdale Ave · 214 m awayPart Lot Control: a request to divide a block into separate lots, often for townhouses
It has been approved.
Part Lot Control Exemption for 4 lots.File 20 219688 STE 19 PL · submitted Nov 18, 2020 · City record - 42 Secord Ave · 225 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City Council approved it.
Zoning By-law Amendment for a 40-storey (126 metres plus 6 metre MPH) high-rise residential development, with a 6-storey podium. The proposal will contain 535 dwelling unit and comprise of 38,806 m2 residential gross floor area, two…File 24 123646 STE 19 OZ · submitted Mar 8, 2024 · City record
7 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: recycling and green bin. November 20: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 398 Main St
Is 398 Main St in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 398 Main St?
There are 4 active planning applications within 250 metres (three approved, one under review). The closest is at 90 Eastdale Ave, 214 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 398 Main St been renovated?
Yes. The City has 4 building permits on record, 1 in the last 5 years. Source: Building Permits.
Is 398 Main St a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 398 Main St?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 20, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives


Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location