4 Cliff St is in Rockcliffe-Smythe. It's outside TRCA flood hazard areas and there are 16 planning applications nearby (15 under review, one hearing on Dec 3).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 16 planning applications within 250 m: 15 under review, one hearing on Dec 3.
  • Lead in tap-water samples is higher than average in postal area M6N.
Building permits0in the last 5 years
Applications nearby16active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 13garbage, green bin and yard waste
Weston RdAstoria AveLambton AveRuthven PlJasper AveArnold AveBushey AveCordella AveDennis AveYork AveCliff StCashman CresGuestville Ave123456789101112Map data: City of Toronto (Toronto Centreline)Weston RdJasper AveArnold AveBushey AveBrownville AveLambton AveCliff StSyndicate AveCashman Cres123456789101112Map data: City of Toronto (Toronto Centreline)
The red dot is 4 Cliff St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 3 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 1 project from 3 permits
  • Addition and underpinning · completed Jan 22, 2018
    Revision re; Repair of an existing party foundation wall. (Commonwith # 2 Cliff Street). ***To construct two storey rear addition, underpining of exsiting basement and interior… · 3 permits in this project (such as building, plumbing and heating) · Permit 10 184388

04Risks and the ground

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M6N5.6% of tests above Ontario's limitYour area · M6NNon Regulated Lead Sample · 306 tests, Jan 14, 2014 to Aug 13, 2026

In postal area M6N, 17 of 306 home tap-water samples (5.6%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6N is higher than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 21 samples here (6.9%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

16 active planning applications within 250 m (about a 3-minute walk): 15 under review, one hearing on Dec 3. That's more than at 9 in 10 Toronto addresses.

  1. 1
    82 Brownville Ave · 68 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
  2. 2
    84 Brownville Ave · 68 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
  3. 3
    80 Brownville Ave · 69 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
  4. 4
    76 Brownville Ave · 71 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
  5. 5
    86 Brownville Ave · 73 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
  6. 6
    74 Brownville Ave · 75 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
  7. 7
    88 Brownville Ave · 76 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
  8. 8
    90 Brownville Ave · 77 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
  9. 9
    94 Brownville Ave · 77 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
  10. 10
    92 Brownville Ave · 78 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
  11. 11
    72 Brownville Ave · 80 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
  12. 12
    96 Brownville Ave · 83 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…
    File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
Short-term rentals nearby3 registered homesWithin 250 mShort Term Rentals Registration

3 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingFridaysThis addressSolid Waste Collection Schedule

Next: November 13: garbage, green bin and yard waste. November 20: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorFrances NunziataWard 5councillor_nunziata@toronto.ca · 416-392-4091

05Quick answers about 4 Cliff St

Is 4 Cliff St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 4 Cliff St?

There are 16 active planning applications within 250 metres (15 under review, one hearing on Dec 3). The closest is at 82 Brownville Ave, 68 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 4 Cliff St been renovated?

Yes. The City has 3 building permits on record, 0 in the last 5 years. Source: Building Permits.

Is 4 Cliff St a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 4 Cliff St?

Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 13, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

4 Cliff St, Toronto M6N: permits, flood risk and what's planned nearby · My Address in Toronto