4 Cliff St
4 Cliff St is in Rockcliffe-Smythe. It's outside TRCA flood hazard areas and there are 16 planning applications nearby (15 under review, one hearing on Dec 3).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 16 planning applications within 250 m: 15 under review, one hearing on Dec 3.
- Lead in tap-water samples is higher than average in postal area M6N.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 3 permits
- Addition and underpinning · completed Jan 22, 2018
Revision re; Repair of an existing party foundation wall. (Commonwith # 2 Cliff Street). ***To construct two storey rear addition, underpining of exsiting basement and interior… · 3 permits in this project (such as building, plumbing and heating) · Permit 10 184388
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M6N, 17 of 306 home tap-water samples (5.6%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6N is higher than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 21 samples here (6.9%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
16 active planning applications within 250 m (about a 3-minute walk): 15 under review, one hearing on Dec 3. That's more than at 9 in 10 Toronto addresses.
- 182 Brownville Ave · 68 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record - 284 Brownville Ave · 68 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record - 380 Brownville Ave · 69 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record - 476 Brownville Ave · 71 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record - 586 Brownville Ave · 73 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record - 674 Brownville Ave · 75 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record - 788 Brownville Ave · 76 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record - 890 Brownville Ave · 77 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record - 994 Brownville Ave · 77 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record - 1092 Brownville Ave · 78 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record - 1172 Brownville Ave · 80 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record - 1296 Brownville Ave · 83 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
The proposal development consists of a residential high-rise development consisting of two towers (43 and 41 Storeys) within one connected building through a 6 storey podium. The 43-storey tower (Tower B) will be located on the north…File 25 222153 WET 05 OZ · submitted Sep 8, 2025 · City record
3 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: garbage, green bin and yard waste. November 20: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 4 Cliff St
Is 4 Cliff St in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 4 Cliff St?
There are 16 active planning applications within 250 metres (15 under review, one hearing on Dec 3). The closest is at 82 Brownville Ave, 68 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 4 Cliff St been renovated?
Yes. The City has 3 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 4 Cliff St a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 4 Cliff St?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 13, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location