406 St Clair Ave E
An address in Rosedale-Moore Park, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
- 0 active development applications and 1 Committee of Adjustment application within 250 m.
01The building
Recent permits (7)
- Building Permit Related(PS) · Revision Issued · Apr 4, 2025
REVISION 01: Third floor bathroom reconfiguration and added tub. Plumbing - Three storey dwelling with attached garage, finished basement, rear deck and basement walkout · Permit 24 133779 PLB - New Building · Revision Issued · Oct 23, 2024
REVISION 01: Removal of interior shear wall on main floor and relocation of dining room window. Added section of west foundation wall drainage. Three storey dwelling with attached garage, finished… · Permit 24 133779 BLD - Building Permit Related(MS) · Inspection · May 28, 2024
HVAC - Three storey dwelling with attached garage, finished basement, rear deck and basement walkout · Permit 24 133779 HVA - Building Permit Related(PS) · Inspection · May 28, 2024
Plumbing - Three storey dwelling with attached garage, finished basement, rear deck and basement walkout · Permit 24 133779 PLB - Building Permit Related (DR) · Inspection · May 28, 2024
Drain - Three storey dwelling with attached garage, finished basement, rear deck and basement walkout · Permit 24 133779 DRN - Demolition · Closed · May 28, 2024
Demolish the existing two storey dwelling · Permit 24 133783 DEM - New Building · Inspection · May 27, 2024
Three storey dwelling with attached garage, finished basement, rear deck and basement walkout · Permit 24 133779 BLD
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
- 1144 Hudson Dr · 148 m · Committee of Adjustment · Minor variance · Approved with ConditionsTo widen the existing front yard driveway and to construct a new side (east) retaining wall. The existing side (east) retaining wall will be demolished.File A0665/26TEY · submitted Sep 11, 2026
Development Applications; Committee of Adjustment Applications · 0 registered short-term rentals within 250 m.
04City services
05Quick answers about 406 St Clair Ave E
Is 406 St Clair Ave E in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 406 St Clair Ave E?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 406 St Clair Ave E?
Collection calendar Wednesday 1. Next garbage pickup: Nov 18, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives





Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location