410 Manor Rd E is in Mount Pleasant East. It's outside TRCA flood hazard areas and there are 18 planning applications nearby (six approved by the tribunal, five under review, four approved, three others).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 18 planning applications within 250 m: six approved by the tribunal, five under review, four approved, three others.
Building permits0in the last 5 years
Applications nearby18active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 12garbage, green bin and yard waste
Bayview AveManor RdBelcourt RdSoudan AveFleming CresHillsdale AveThurston RdDonegall DrCameron CresBelsize DrGresham RdCleveland St123456789101112Map data: City of Toronto (Toronto Centreline)Bayview AveSoudan AveManor RdHillsdale AveParkhurst BlvdGresham RdBelsize DrCleveland St123456789101112Map data: City of Toronto (Toronto Centreline)
The red dot is 410 Manor Rd E. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 2 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 1 project from 2 permits
  • Addition, deck or porch and more · completed Jun 30, 2020
    Proposed rear two storey addition, interior alterations on all floors, rear deck and front covered porch. · 2 permits in this project (such as building, plumbing and heating) · Permit 15 255325

04Risks and the ground

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M4S2.3% of tests above Ontario's limitYour area · M4SNon Regulated Lead Sample · 220 tests, Feb 20, 2014 to Oct 16, 2026

In postal area M4S, 5 of 220 home tap-water samples (2.3%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4S is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 17 samples here (7.7%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

18 active planning applications within 250 m (about a 3-minute walk): six approved by the tribunal, five under review, four approved, three others. That's more than at almost all Toronto addresses.

  1. 1
    61 Mann Ave · 177 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Proposal for a 40 storeys mixed-use building, including residential and commercial components. The building will contain a total of 465residential units and 564 m2 of retail space fronting Eglinton Avenue East. The residential GFA is…
    File 22 225964 NNY 15 OZ · submitted Nov 4, 2022 · City record
  2. 2
    63 Mann Ave · 181 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Proposal for a 40 storeys mixed-use building, including residential and commercial components. The building will contain a total of 465residential units and 564 m2 of retail space fronting Eglinton Avenue East. The residential GFA is…
    File 22 225964 NNY 15 OZ · submitted Nov 4, 2022 · City record
  3. 3
    65 Mann Ave · 192 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Proposal for a 40 storeys mixed-use building, including residential and commercial components. The building will contain a total of 465residential units and 564 m2 of retail space fronting Eglinton Avenue East. The residential GFA is…
    File 22 225964 NNY 15 OZ · submitted Nov 4, 2022 · City record
  4. 4
    1600 Bayview Ave · 195 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Aug 10, 2023.

    Proposal to construct a three-storey rear addition, a third floor addition with two residential units and relief for minimum parking space requirements for an existing building. This application was previously deferred to ensure the…
    File A0076/23NY · submitted Jan 24, 2023
  5. 5
    1779 Bayview Ave · 197 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Official Plan and Zoning By-law Amendment for a 35-storey mixed use building containing a total of 373 dwelling units and 541 square metres of retail space. The development would have a total gross floor area (GFA) of 27,846 square…
    File 22 221903 NNY 15 OZ · submitted Oct 25, 2022 · City record
  6. 6
    1779 Bayview Ave · 197 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposal for 35-storey mixed use building containing a total of 373 dwelling units and 541 square metres of retail space. The development would have a total gross floor area (GFA) of 27,846 square metres, resulting in a density of 8.83 FSI.
    File 22 221902 NNY 15 SA · submitted Oct 25, 2022 · City record
  7. 7
    67 Mann Ave · 199 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Proposal for a 40 storeys mixed-use building, including residential and commercial components. The building will contain a total of 465residential units and 564 m2 of retail space fronting Eglinton Avenue East. The residential GFA is…
    File 22 225964 NNY 15 OZ · submitted Nov 4, 2022 · City record
  8. 8
    1661 Bayview Ave · 200 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Jun 5, 2019.

    To permit interior and exterior alterations to the existing building. Please note a previous application (File # A0141/19NY) with respect to the subject property, was before the Committee of Adjustment on Thursday, April 18, 2019, which…
    File A0295/19NY · submitted Apr 29, 2019
  9. 9
    1779-1781 Bayview Ave · 201 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposal for 35-storey mixed use building containing a total of 373 dwelling units and 541 square metres of retail space. The development would have a total gross floor area (GFA) of 27,846 square metres, resulting in a density of 8.83 FSI.
    File 22 221902 NNY 15 SA · submitted Oct 25, 2022 · City record
  10. 10
    1779-1781 Bayview Ave · 201 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Official Plan and Zoning By-law Amendment for a 35-storey mixed use building containing a total of 373 dwelling units and 541 square metres of retail space. The development would have a total gross floor area (GFA) of 27,846 square…
    File 22 221903 NNY 15 OZ · submitted Oct 25, 2022 · City record
  11. 11
    59 Hoyle Ave · 207 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan Control Application to permit a 25-storey, mixed use building with 300 dwelling units, 20,974.8 square metres of residential gross floor area, 710 square metres of non-residential gross floor area, 97 parking spaces and 308…
    File 22 133815 NNY 15 SA · submitted Apr 12, 2022 · City record
  12. 12
    61 Hoyle Ave · 215 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan Control Application to permit a 25-storey, mixed use building with 300 dwelling units, 20,974.8 square metres of residential gross floor area, 710 square metres of non-residential gross floor area, 97 parking spaces and 308…
    File 22 133815 NNY 15 SA · submitted Apr 12, 2022 · City record
Short-term rentals nearby1 registered homeWithin 250 mShort Term Rentals Registration

1 home within 250 m is registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingThursdaysThis addressSolid Waste Collection Schedule

Next: November 12: garbage, green bin and yard waste. November 19: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorRachel Chernos Lin Ward 15Councillor_ChernosLin@toronto.ca · 416-395-6408

05Quick answers about 410 Manor Rd E

Is 410 Manor Rd E in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 410 Manor Rd E?

There are 18 active planning applications within 250 metres (six approved by the tribunal, five under review, four approved, three others). The closest is at 61 Mann Ave, 177 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 410 Manor Rd E been renovated?

Yes. The City has 2 building permits on record, 0 in the last 5 years. Source: Building Permits.

Is 410 Manor Rd E a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 410 Manor Rd E?

Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 12, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Southwest corner Hillsdale and Bayview Ave
1932 · 196 m awaySouthwest corner Hillsdale and Bayview AveCity of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 1299

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location