Skip to content
My Address in Toronto
Address report

42 Edgemore Dr

42 Edgemore Dr is in Stonegate-Queensway. It's outside TRCA flood hazard areas and there are 11 planning applications nearby (seven under appeal, three under review, one under appeal after a refusal).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 11 planning applications within 250 m: seven under appeal, three under review, one under appeal after a refusal.
Building permits0in the last 5 years
Applications nearby11active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 10garbage, green bin and yard waste
Royal York RdEdgemore DrHumbervale BlvdPrince Edward DrGrenview BlvdAshton ManorMeadowvale DrElsfield Rd1234567891011Map data: City of Toronto (Toronto Centreline)Edgemore DrPrince Edward DrElsfield RdGrenview BlvdAshton ManorMeadowvale DrGlenroy AveBermuda Ave1234567891011Map data: City of Toronto (Toronto Centreline)
The red dot is 42 Edgemore Dr. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 3 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 3 projects from 3 permits
  • Back Water Valve (Sewer only) · completed Jun 14, 2018
    Proposal to install a back water valve · Permit 18 176793
  • Addition and deck or porch · inspection · issued Aug 20, 2009
    To construct a one storey rear addition and covered deck to existing single family detached dwelling. · Permit 09 158117
  • Addition and deck or porch · inspection · issued Oct 6, 2004
    One storey front addition and porch · Permit 04 179746

04Risks and the ground

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M8Y0.7% of tests above Ontario's limitYour area · M8YNon Regulated Lead Sample · 153 tests, May 21, 2014 to Aug 18, 2026

In postal area M8Y, 1 of 153 home tap-water samples (0.7%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M8Y is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 4 samples here (2.6%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

11 active planning applications within 250 m (about a 3-minute walk): seven under appeal, three under review, one under appeal after a refusal. That's more than at 9 in 10 Toronto addresses.

  1. 1
    2915 Bloor St W · 166 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposes to construct a new 29-storey mixed-use building, containing 423 dwelling units, including 7 rental replacement units, and a total of 26,114 sq. m of gross floor area (GFA), including 1,024 sq. m of non-residential GFA, resulting…
    File 25 208823 WET 03 OZ · submitted Aug 12, 2025 · City record
  2. 2
    2915-2917 Bloor St W · 168 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposes to construct a new 29-storey mixed-use building, containing 423 dwelling units, including 7 rental replacement units, and a total of 26,114 sq. m of gross floor area (GFA), including 1,024 sq. m of non-residential GFA, resulting…
    File 25 208823 WET 03 OZ · submitted Aug 12, 2025 · City record
  3. 3
    2917 Bloor St W · 170 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposes to construct a new 29-storey mixed-use building, containing 423 dwelling units, including 7 rental replacement units, and a total of 26,114 sq. m of gross floor area (GFA), including 1,024 sq. m of non-residential GFA, resulting…
    File 25 208823 WET 03 OZ · submitted Aug 12, 2025 · City record
  4. 4
    2939 Bloor St W · 185 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposes to construct a new 29-storey mixed-use building, containing 423 dwelling units, including 7 rental replacement units, and a total of 26,114 sq. m of gross floor area (GFA), including 1,024 sq. m of non-residential GFA, resulting…
    File 25 208823 WET 03 OZ · submitted Aug 12, 2025 · City record
  5. 5
    2941-2943 Bloor St W · 191 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposes to construct a new 29-storey mixed-use building, containing 423 dwelling units, including 7 rental replacement units, and a total of 26,114 sq. m of gross floor area (GFA), including 1,024 sq. m of non-residential GFA, resulting…
    File 25 208823 WET 03 OZ · submitted Aug 12, 2025 · City record
  6. 6
    2943 A Bloor St W · 196 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposes to construct a new 29-storey mixed-use building, containing 423 dwelling units, including 7 rental replacement units, and a total of 26,114 sq. m of gross floor area (GFA), including 1,024 sq. m of non-residential GFA, resulting…
    File 25 208823 WET 03 OZ · submitted Aug 12, 2025 · City record
  7. 7
    2943 Bloor St W · 197 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposes to construct a new 29-storey mixed-use building, containing 423 dwelling units, including 7 rental replacement units, and a total of 26,114 sq. m of gross floor area (GFA), including 1,024 sq. m of non-residential GFA, resulting…
    File 25 208823 WET 03 OZ · submitted Aug 12, 2025 · City record
  8. 8
    2947 A Bloor St W · 206 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed development of a 7 storey mixed use building, comprised of residential amenity and retail uses at grade and six storeys of residential.
    File 22 139459 WET 03 OZ · submitted Apr 28, 2022 · City record
  9. 9
    2947 Bloor St W · 225 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed development of a 7 storey mixed use building, comprised of residential amenity and retail uses at grade and six storeys of residential.
    File 22 139459 WET 03 OZ · submitted Apr 28, 2022 · City record
  10. 10
    86 Elsfield Rd · 228 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Oct 22, 2015. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    To construct a new detached dwelling with an integral garage.
    File A432/15EYK · submitted Jul 14, 2015
  11. 11
    2951 Bloor St W · 230 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed development of a 7 storey mixed use building, comprised of residential amenity and retail uses at grade and six storeys of residential.
    File 22 139459 WET 03 OZ · submitted Apr 28, 2022 · City record
Short-term rentals nearby1 registered homeWithin 250 mShort Term Rentals Registration

1 home within 250 m is registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingTuesdaysThis addressSolid Waste Collection Schedule

Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorAmber MorleyWard 3Councillor_Morley@toronto.ca · 416-397-9273

05Quick answers about 42 Edgemore Dr

Is 42 Edgemore Dr in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 42 Edgemore Dr?

There are 11 active planning applications within 250 metres (seven under appeal, three under review, one under appeal after a refusal). The closest is at 2915 Bloor St W, 166 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 42 Edgemore Dr been renovated?

Yes. The City has 3 building permits on record, 0 in the last 5 years. Source: Building Permits.

Is 42 Edgemore Dr a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 42 Edgemore Dr?

Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

42 Edgemore Dr, Toronto M8Y: permits, flood risk and what's planned nearby · My Address in Toronto