Skip to content
My Address in Toronto
Address report

43 Wanless Ave

43 Wanless Ave is in Lawrence Park North. It's outside TRCA flood hazard areas and there are 20 planning applications nearby (seven under review, seven approved by the tribunal, three under appeal after a refusal, three others).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 20 planning applications within 250 m: seven under review, seven approved by the tribunal, three under appeal after a refusal, three others.
Building permits0in the last 5 years
Applications nearby20active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 11garbage, green bin and yard waste
Lawrence AveYonge StMount Pleasant RdRanleigh AveBedford Park AveLorindale AveWoburn AveWanless AveDu Maurier BlvdJedburgh RdCardinal PlLawrence CresPreston PlDeal Ave123456789101112Map data: City of Toronto (Toronto Centreline)Yonge StLawrence AveRanleigh AveWoburn AveBowood AveDu Maurier BlvdCardinal PlWeybourne CresPreston PlDeal Ave123456789101112Map data: City of Toronto (Toronto Centreline)
The red dot is 43 Wanless Ave. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 5 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 3 projects from 5 permits
  • Porch · completed Sep 27, 2022
    PROPOSED: Current front porch to be demolished and new replacement in place - expansion across the front of the building. Existing back deck to be demolished and replacement deck built, along with… · Permit 21 159240
  • Other Proposal · completed Sep 18, 2026
    Int alt and repair to convert duplex to single family dwelling house and replace front coverd proch. · 3 permits in this project (such as building, plumbing and heating) · Permit 08 146219
  • Garage · completed Jun 8, 2026
    Replace existing 20' x 20' garage. · Permit 05 138570

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M4N1.5% of tests above Ontario's limitYour area · M4NNon Regulated Lead Sample · 269 tests, Feb 24, 2014 to Oct 19, 2026

In postal area M4N, 4 of 269 home tap-water samples (1.5%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4N is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 17 samples here (6.3%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

20 active planning applications within 250 m (about a 3-minute walk): seven under review, seven approved by the tribunal, three under appeal after a refusal, three others. That's more than at almost all Toronto addresses.

  1. 1
    45 Wanless Ave · 10 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The City has received it. A hearing date hasn't been set yet.

    To construct a new two storey detached garage at the rear of the property. The existing two detached garage will be demolished.
    File A0846/17NY · submitted Sep 18, 2017
  2. 2
    47 Ranleigh Ave · 112 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    To convert the existing residential building into a four storey apartment building with a height of 12.95 metres and a total of 16 dwelling units. Rezoning application for this site 21 176276 NNY 15 OZ is also being reviewed together with…
    File 22 170570 NNY 15 SA · submitted Jun 30, 2022 · City record
  3. 3
    49 Lawrence Ave E · 167 m away
    Committee of Adjustment · Consent (severance): permission to split a lot or change property lines

    The Committee of Adjustment refused it on Mar 21, 2019.

    To obtain consent to sever a portion of the land for the purpose of lot additions, to create eight new lots. File Numbers: B0056/18NY, A0803/18NY, A0804/18NY, A0805/18NY, A0806/18NY, A0807/18NY, A0808/18NY, A0809/18NY, & A0810/18NY will…
    File B0056/18NY · submitted Nov 22, 2018
  4. 4
    84 Weybourne Cres · 206 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Mar 21, 2019. It has been appealed to the Toronto Local Appeal Body (TLAB), which will hold its own hearing and make the final decision.

    To construct a new semi-detached dwelling. File Numbers: B0056/18NY, A0803/18NY, A0804/18NY, A0805/18NY, A0806/18NY, A0807/18NY, A0808/18NY, A0809/18NY, & A0810/18NY will be considered jointly.
    File A0810/18NY · submitted Nov 21, 2018
  5. 5
    84 Weybourne Cres · 206 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Mar 21, 2019. It has been appealed to the Toronto Local Appeal Body (TLAB), which will hold its own hearing and make the final decision.

    To construct a new semi-detached dwelling. File Numbers: B0056/18NY, A0803/18NY, A0804/18NY, A0805/18NY, A0806/18NY, A0807/18NY, A0808/18NY, A0809/18NY, & A0810/18NY will be considered jointly.
    File A0809/18NY · submitted Nov 21, 2018
  6. 6
    3200 Yonge St · 209 m away
    Condominium: a request to divide a building into condominium units

    City planners are reviewing it. Residents can comment before a decision is made.

    *** Draft Plan of Condominium for 109 units.
    File 21 231950 NNY 08 CD · submitted Oct 29, 2021 · City record
  7. 7
    3200 Yonge St · 209 m away
    Site Plan: City review of the design and layout of a new building

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Site Plan Control Application to permit the construction of an 14-storey mixed used building with a total of 77 proposed residential units and proposed ground level commercial space of 400 square metres. The proposed gross floor area of…
    File 21 162972 NNY 08 SA · submitted May 31, 2021 · City record
  8. 8
    3196 Yonge St · 210 m away
    Condominium: a request to divide a building into condominium units

    City planners are reviewing it. Residents can comment before a decision is made.

    *** Draft Plan of Condominium for 109 units.
    File 21 231950 NNY 08 CD · submitted Oct 29, 2021 · City record
  9. 9
    3196 Yonge St · 210 m away
    Site Plan: City review of the design and layout of a new building

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Site Plan Control Application to permit the construction of an 14-storey mixed used building with a total of 77 proposed residential units and proposed ground level commercial space of 400 square metres. The proposed gross floor area of…
    File 21 162972 NNY 08 SA · submitted May 31, 2021 · City record
  10. 10
    3198 Yonge St · 210 m away
    Site Plan: City review of the design and layout of a new building

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Site Plan Control Application to permit the construction of an 14-storey mixed used building with a total of 77 proposed residential units and proposed ground level commercial space of 400 square metres. The proposed gross floor area of…
    File 21 162972 NNY 08 SA · submitted May 31, 2021 · City record
  11. 11
    3198 Yonge St · 210 m away
    Condominium: a request to divide a building into condominium units

    City planners are reviewing it. Residents can comment before a decision is made.

    *** Draft Plan of Condominium for 109 units.
    File 21 231950 NNY 08 CD · submitted Oct 29, 2021 · City record
  12. 12
    3202 Yonge St · 210 m away
    Condominium: a request to divide a building into condominium units

    City planners are reviewing it. Residents can comment before a decision is made.

    *** Draft Plan of Condominium for 109 units.
    File 21 231950 NNY 08 CD · submitted Oct 29, 2021 · City record
Short-term rentals nearby4 registered homesWithin 250 mShort Term Rentals Registration

4 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingWednesdaysThis addressSolid Waste Collection Schedule

Next: November 11: garbage, green bin and yard waste. November 18: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorRachel Chernos Lin Ward 15Councillor_ChernosLin@toronto.ca · 416-395-6408

05Quick answers about 43 Wanless Ave

Is 43 Wanless Ave in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 43 Wanless Ave?

There are 20 active planning applications within 250 metres (seven under review, seven approved by the tribunal, three under appeal after a refusal, three others). The closest is at 45 Wanless Ave, 10 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 43 Wanless Ave been renovated?

Yes. The City has 5 building permits on record, 0 in the last 5 years. Source: Building Permits.

Is 43 Wanless Ave a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 43 Wanless Ave?

Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 11, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

North Toronto Firehall construction, Wanless Avenue and Yonge Street
1930 · 129 m awayNorth Toronto Firehall construction, Wanless Avenue and Yonge StreetCity of Toronto Archives, Fonds 1266, Item 22701
Yonge Street at Wanless Avenue, No. 3102 Yonge St
1927 · 129 m awayYonge Street at Wanless Avenue, No. 3102 Yonge StCity of Toronto Archives, Fonds 1231, Item 1643
St. Edmund's Drive north to Lawrence Avenue
1948 · 135 m awaySt. Edmund's Drive north to Lawrence AvenueCity of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 1842
Atkinson, John, shop, Yonge St., s.w. cor. Bedford Park Ave.
1913 · 175 m awayAtkinson, John, shop, Yonge St., s.w. cor. Bedford Park Ave. Courtesy of Toronto Public Library
Yonge St. looking w. across Yonge St. to gates of W. G. Ellis' house, Yonge St., n.w. cor. Bedford Park Ave.
1912 · 175 m awayYonge St. looking w. across Yonge St. to gates of W. G. Ellis' house, Yonge St., n.w. cor. Bedford Park Ave. Courtesy of Toronto Public Library
ATKINSON, JOHN, shop, Yonge St., s.w. cor. Bedford Park Ave.; INTERIOR.
1920 · 175 m awayATKINSON, JOHN, shop, Yonge St., s.w. cor. Bedford Park Ave.; INTERIOR. Courtesy of Toronto Public Library
Atkinson, John, shop, Yonge St., s.w. cor. Bedford Park Ave.
1900 · 175 m awayAtkinson, John, shop, Yonge St., s.w. cor. Bedford Park Ave. Courtesy of Toronto Public Library
Durham OX Hotel, Yonge St., w. side, near Bedford Park Ave., Toronto, Ont.
1900 · 175 m awayDurham OX Hotel, Yonge St., w. side, near Bedford Park Ave., Toronto, Ont. Courtesy of Toronto Public Library
Yonge St. looking s. from Bedford Park Ave.
1921 · 175 m awayYonge St. looking s. from Bedford Park Ave. Courtesy of Toronto Public Library

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

43 Wanless Ave, Toronto M4N: permits, flood risk and what's planned nearby · My Address in Toronto