445 Milner Ave
445 Milner Ave is in Malvern East. It's outside TRCA flood hazard areas and there are no active planning applications nearby.
Data as of Nov 8, 2026 · Every item lists its source
- 14 building permits in the last 5 years.
- Outside TRCA flood hazard areas.
03The building
14 building permits in the last 5 years, for 5 projects. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 10 projects from 23 permits
- Interior Alterations · permit issued · issued Oct 26, 2026
Interior alterations to add a walkin cooler and freezer with hvac and plumbing to existing warehouse/office. · 3 permits in this project (such as building, plumbing and heating) · Permit 26 259535 - Interior Alterations · completed Aug 25, 2026
Proposal for interior alterations to exiting industrial unit · 4 permits in this project (such as building, plumbing and heating) · Permit 26 124567 - Interior Alterations · completed Sep 21, 2022
Proposal for interior alterations to existing space. SHELL Unit 4 · 3 permits in this project (such as building, plumbing and heating) · Permit 22 125605 - Sprinklers · inspection · issued Mar 22, 2022
Installing wet sprinkler system to accommodate arch features · Permit 22 121959 - Interior Alterations · completed Apr 21, 2022
Interior alterations to fit 6 new offices · 3 permits in this project (such as building, plumbing and heating) · Permit 21 236127 - Interior Alterations · completed Aug 29, 2025
Proposal for interior alterations to unit 6 of existing industrial building. "JT Walsh Contracting" · 3 permits in this project (such as building, plumbing and heating) · Permit 20 123759 - Other(FS) · completed Nov 3, 2017
Installation of one (1) new fire protection backflow preventer onto existing sprinkler system · Permit 17 222578 - Building work · inspection · issued May 27, 2015
To enlarge existing over-head door opening from 8' x 10' to 10' x 12' · Permit 15 156442 - Addition · permit issued · issued Apr 20, 2009
Addition of 3 roof top cooling units and provisions for a possible fourth unit. · 2 permits in this project (such as building, plumbing and heating) · Permit 09 117039 - Interior renovation, plumbing and more · inspection · issued Sep 5, 2008
Plumbing - Interior alterations to existing office space in warehouse, incl. hvac and plumbing · 2 permits in this project (such as building, plumbing and heating) · Permit 08 183939
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M1B, 0 of 25 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). That's too few samples to compare with the rest of the city. Health Canada recommends a stricter limit of 5 micrograms per litre: 2 samples here (8.0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
No active planning applications within 250 m (about a 3-minute walk). Most Toronto addresses (64%) have at least one application nearby.
No homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). Most Toronto addresses (73%) have at least one short-term rental nearby.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 445 Milner Ave
Is 445 Milner Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 445 Milner Ave?
There are no active development or Committee of Adjustment applications within 250 metres. Source: Development Applications; Committee of Adjustment Applications.
Has 445 Milner Ave been renovated?
Yes. The City has 23 building permits on record, 14 in the last 5 years. Source: Building Permits.
Is 445 Milner Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 445 Milner Ave?
Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location