464 Grace St
464 Grace St is in Palmerston-Little Italy. It's outside TRCA flood hazard areas and there are 5 planning applications nearby (three waiting for a hearing date, two under appeal after a refusal).
Data as of Nov 8, 2026 · Every item lists its source
- 3 building permits in the last 5 years.
- Outside TRCA flood hazard areas.
- 5 planning applications within 250 m: three waiting for a hearing date, two under appeal after a refusal.
03The building
3 building permits in the last 5 years, for 1 project. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 3 permits
- Addition(s) · revision issued · issued May 31, 2023
Rev 01 - Change the basement plan, creating an open-concept recreation room and revising a proposed patio door to the second floorpropose to construct a new basement walkout, new rear deck, new… · 3 permits in this project (such as building, plumbing and heating) · Permit 23 123849
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M6G, 5 of 536 home tap-water samples (0.9%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6G is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 17 samples here (3.2%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
5 active planning applications within 250 m (about a 3-minute walk): three waiting for a hearing date, two under appeal after a refusal. That's more than at most Toronto addresses (the typical address has 1).
- 1429 Montrose Ave · 202 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on Mar 23, 2022. It has been appealed to the Toronto Local Appeal Body (TLAB), which will hold its own hearing and make the final decision.
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition, a rear three-storey addition and rear decks on each level of the dwelling. Also, to install a secondary suite within the basement with front…File A1474/21TEY · submitted Dec 7, 2021 - 2131 Jersey Ave · 214 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The hearing was postponed. A new date hasn't been published yet.
To obtain consent to sever the property into two residential lots.File B0065/26TEY · submitted Oct 19, 2026 - 3131 Jersey Ave · 214 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To construct a new three-storey seven-unit semi-detached apartment building (including a third storey mezzanine level), with a covered front porch with stairs, and a mechanical penthouse enclosure (including rooftop access, above the…File A0737/26TEY · submitted Oct 19, 2026 - 4131 Jersey Ave · 214 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To construct a new three-storey seven-unit semi-detached apartment building (including a third storey mezzanine level), with a covered front porch with stairs, and a mechanical penthouse enclosure (including rooftop access, above the…File A0739/26TEY · submitted Oct 19, 2026 - 5614 Manning Ave · 250 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on Oct 9, 2014. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
To legalize and maintain the existing coach house at the rear of the existing 2½-storey semi-detached dwelling. Also, to convert a portion of the coach house into a two-car garage, with access to the rear lane way.File A0423/14TEY · submitted Apr 28, 2014
13 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at 9 in 10 Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 12: recycling and green bin. November 19: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 464 Grace St
Is 464 Grace St in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 464 Grace St?
There are 5 active planning applications within 250 metres (three waiting for a hearing date, two under appeal after a refusal). The closest is at 429 Montrose Ave, 202 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 464 Grace St been renovated?
Yes. The City has 3 building permits on record, 3 in the last 5 years. Source: Building Permits.
Is 464 Grace St a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 464 Grace St?
Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 19, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives





Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location