5 Grenoble Dr
5 Grenoble Dr is in Flemingdon Park. It's outside TRCA flood hazard areas and there are 8 planning applications nearby (three approved, two under review, one approved by the tribunal, two others).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 8 planning applications within 250 m: three approved, two under review, one approved by the tribunal, two others.
03The building
1 building permit in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 1 permit
- Sign Building Permit Related · permit issued · issued Sep 3, 2026
1 wall sign**flemmingdon park community church** · Permit 26 229098
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M3C, 0 of 26 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). That's too few samples to compare with the rest of the city. Health Canada recommends a stricter limit of 5 micrograms per litre: 0 samples here (0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
8 active planning applications within 250 m (about a 3-minute walk): three approved, two under review, one approved by the tribunal, two others. That's more than at most Toronto addresses (the typical address has 1).
- 125 St Dennis Dr · 48 m awaySubdivision: a request to divide land into new lots and streets
It has been approved.
Draft Plan of Subdivision to facilitate six new blocks for the In-fill redevelopment on a site that contains a 17-storey rental apartment building (BLOCK 1). The application is to construct a 37-storey and 18 townhouses (BLOCK 3);…File 19 105324 NNY 16 SB · submitted Jan 16, 2019 · City record - 225 St Dennis Dr · 48 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
The Ontario Land Tribunal (formerly the OMB) approved it.
Construct an infill development: 37-storey tower-and-base building and 18 unit, stacked townhouse (southern portion of site); a 12-storey mid-rise building and 14 freehold townhouses (northern portion of site). There will be 552 new units…File 15 261823 NNY 26 OZ · submitted Dec 7, 2015 · City record - 325 St Dennis Dr · 48 m awayCondominium: a request to divide a building into condominium units
It has been approved.
Draft Plan of Condo Application for a 37-storey residential building with a total of 412 units.File 24 250878 NNY 16 CD · submitted Dec 16, 2024 · City record - 448 Grenoble Dr · 191 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposal for development includes 43- and 41-storey towers connected by a 6 storey podium, with on-site parkland dedication and a privately-owned publicly-accessible space. The towers and podium contain 993 residential units, comprised of…File 22 127124 NNY 16 SA · submitted Mar 25, 2022 · City record - 525 St Dennis Dr · 211 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The City has received it. A hearing date hasn't been set yet.
John A. dealing with applicant (Thorncliffe park area)DO NOT CLOSE CONSENT FILE - APPLICANT IS WORKING ON A NEW PLANFile B0030/15NY · submitted Jul 29, 2015 - 67 St Dennis Dr · 228 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The Committee of Adjustment approved it on Aug 28, 2025.
To obtain consent to sever the Property into three parcels and to create various easements/rights-of-way. Parcel 1 contains an existing residential building. Parcel 2 will facilitate development of a new building. Parcel 3 will be future…File B0008/25NY · submitted May 12, 2025 - 710 Ferrand Dr · 238 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposed development consists of three (3) phases. Phase One is - privately Owned Publicly Accessible Open Space (POPS) with below grade parking in the existing conference centre. Phase Two - proposes two towers of 56 and 49 storeys…File 22 184086 NNY 16 SA · submitted Jul 29, 2022 · City record - 810 Ferrand Dr · 238 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposed development consists of three (3) phases. Phase One is - privately Owned Publicly Accessible Open Space (POPS) with below grade parking in the existing conference centre. Phase Two - proposes two towers of 56 and 49 storeys…File 22 184087 NNY 16 OZ · submitted Jul 29, 2022 · City record
No homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). Most Toronto addresses (73%) have at least one short-term rental nearby.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 12: garbage, green bin and yard waste. November 19: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 5 Grenoble Dr
Is 5 Grenoble Dr in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 5 Grenoble Dr?
There are 8 active planning applications within 250 metres (three approved, two under review, one approved by the tribunal, two others). The closest is at 25 St Dennis Dr, 48 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 5 Grenoble Dr been renovated?
Yes. The City has 1 building permit on record, 1 in the last 5 years. Source: Building Permits.
Is 5 Grenoble Dr a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 5 Grenoble Dr?
Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 12, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location