5 Major St
5 Major St is in University. It's outside TRCA flood hazard areas and there are 4 planning applications nearby (two under review, one under appeal after a refusal, one deferred).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 4 planning applications within 250 m: two under review, one under appeal after a refusal, one deferred.
03The building
1 building permit in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 1 permit
- Garage · completed Dec 18, 2023
Proposal to demolish existing detached garage in the rear yard · Permit 22 241819
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M5S, 0 of 167 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5S is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (3.0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
4 active planning applications within 250 m (about a 3-minute walk): two under review, one under appeal after a refusal, one deferred. That's about typical for Toronto (the typical address has 1).
- 157 Major St · 149 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on Oct 2, 2020. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
To legalize and maintain the basement secondary suite in the existing three-storey, two-unit townhouse.File A0395/20TEY · submitted Apr 24, 2020 - 246 Russell St · 179 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear three-storey addition, rear and side (west) balconies on the second and third storeys, and a side (west) basement window well. There will be a…File A0643/25TEY · submitted Aug 5, 2025 - 3508 Spadina Ave · 187 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposed nine-storey mixed-use building with a residential gross floor area of 8,213 square metres, including 109 affordable rental units, and a non-residential gross floor area of 3,185 square metres.File 22 136133 STE 11 SA · submitted Apr 20, 2022 · City record - 4502 Spadina Ave · 199 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposed nine-storey mixed-use building with a residential gross floor area of 8,213 square metres, including 109 affordable rental units, and a non-residential gross floor area of 3,185 square metres.File 22 136133 STE 11 SA · submitted Apr 20, 2022 · City record
33 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 5 Major St
Is 5 Major St in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 5 Major St?
There are 4 active planning applications within 250 metres (two under review, one under appeal after a refusal, one deferred). The closest is at 57 Major St, 149 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 5 Major St been renovated?
Yes. The City has 1 building permit on record, 1 in the last 5 years. Source: Building Permits.
Is 5 Major St a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 5 Major St?
Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location