50 Commons Dr is in Tam O'Shanter-Sullivan. It's outside TRCA flood hazard areas and there are 9 planning applications nearby (seven approved by the tribunal, two under review).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 9 planning applications within 250 m: seven approved by the tribunal, two under review.
  • Lead in tap-water samples is higher than average in postal area M1T.
Building permits0in the last 5 years
Applications nearby9active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 12garbage, green bin and yard waste
Victoria Park AveSheppard AveCommons DrHazelnut CresChichester PlEsquire RdEsquire CrclWishing Well DrPharmacy AveFoxhill RdBugle Hill RdDobbin Rd123456789Map data: City of Toronto (Toronto Centreline)Victoria Park AveSheppard AveCommons DrChichester PlEsquire RdFoxhill RdBugle Hill RdDobbin Rd123456789Map data: City of Toronto (Toronto Centreline)
The red dot is 50 Commons Dr. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone open (1 closed)This addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 0 on record

The City has no building permits on record for this address. About 9 in 10 Toronto addresses also had none in the last 5 years.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M1T6.3% of tests above Ontario's limitYour area · M1TNon Regulated Lead Sample · 32 tests, May 22, 2014 to Oct 7, 2024

In postal area M1T, 2 of 32 home tap-water samples (6.2%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M1T is higher than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 2 samples here (6.2%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

9 active planning applications within 250 m (about a 3-minute walk): seven approved by the tribunal, two under review. That's more than at most Toronto addresses (the typical address has 1).

  1. 1
    2993 Sheppard Ave E · 185 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Development comprising of a 22 storey mixed-use building, containing 410 residential units, non-residential GFA of 1598 square metres, a floor space index of 4.31 times the lot area, and 389 parking spaces.
    File 22 137043 ESC 22 SA · submitted Apr 22, 2022 · City record
  2. 2
    2926 Sheppard Ave E · 189 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    The proposed development consists of a 50-storey mixed use building (157.0 metres excluding a 7.0 metre mechanical penthouse), inclusive of a 6-storey base building. A total gross floor area (GFA) of approximately 43,369 square metres,…
    File 25 147607 ESC 22 OZ · submitted Apr 22, 2025 · City record
  3. 3
    2924 Sheppard Ave E · 193 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    The proposed development consists of a 50-storey mixed use building (157.0 metres excluding a 7.0 metre mechanical penthouse), inclusive of a 6-storey base building. A total gross floor area (GFA) of approximately 43,369 square metres,…
    File 25 147607 ESC 22 OZ · submitted Apr 22, 2025 · City record
  4. 4
    2922 Sheppard Ave E · 197 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    The proposed development consists of a 50-storey mixed use building (157.0 metres excluding a 7.0 metre mechanical penthouse), inclusive of a 6-storey base building. A total gross floor area (GFA) of approximately 43,369 square metres,…
    File 25 147607 ESC 22 OZ · submitted Apr 22, 2025 · City record
  5. 5
    2912 Sheppard Ave E · 202 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    The proposed development consists of a 50-storey mixed use building (157.0 metres excluding a 7.0 metre mechanical penthouse), inclusive of a 6-storey base building. A total gross floor area (GFA) of approximately 43,369 square metres,…
    File 25 147607 ESC 22 OZ · submitted Apr 22, 2025 · City record
  6. 6
    2920 Sheppard Ave E · 204 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    The proposed development consists of a 50-storey mixed use building (157.0 metres excluding a 7.0 metre mechanical penthouse), inclusive of a 6-storey base building. A total gross floor area (GFA) of approximately 43,369 square metres,…
    File 25 147607 ESC 22 OZ · submitted Apr 22, 2025 · City record
  7. 7
    2918 Sheppard Ave E · 210 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    The proposed development consists of a 50-storey mixed use building (157.0 metres excluding a 7.0 metre mechanical penthouse), inclusive of a 6-storey base building. A total gross floor area (GFA) of approximately 43,369 square metres,…
    File 25 147607 ESC 22 OZ · submitted Apr 22, 2025 · City record
  8. 8
    2914 Sheppard Ave E · 215 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    The proposed development consists of a 50-storey mixed use building (157.0 metres excluding a 7.0 metre mechanical penthouse), inclusive of a 6-storey base building. A total gross floor area (GFA) of approximately 43,369 square metres,…
    File 25 147607 ESC 22 OZ · submitted Apr 22, 2025 · City record
  9. 9
    1800 Pharmacy Ave · 242 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Development comprising of a 22 storey mixed-use building, containing 410 residential units, non-residential GFA of 1598 square metres, a floor space index of 4.31 times the lot area, and 389 parking spaces.
    File 22 137043 ESC 22 SA · submitted Apr 22, 2022 · City record
Short-term rentals nearby2 registered homesWithin 250 mShort Term Rentals Registration

2 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingThursdaysThis addressSolid Waste Collection Schedule

Next: November 12: garbage, green bin and yard waste. November 19: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorNick MantasWard 22Councillor_Mantas@toronto.ca · 416-392-7431

05Quick answers about 50 Commons Dr

Is 50 Commons Dr in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 50 Commons Dr?

There are 9 active planning applications within 250 metres (seven approved by the tribunal, two under review). The closest is at 2993 Sheppard Ave E, 185 m away. Source: Development Applications; Committee of Adjustment Applications.

Is 50 Commons Dr a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 50 Commons Dr?

Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 12, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

50 Commons Dr, Toronto M1T: permits, flood risk and what's planned nearby · My Address in Toronto