50 Heath St E
50 Heath St E is in Rosedale-Moore Park. It added a garden suite in 2026, it's outside TRCA flood hazard areas and there are 4 planning applications nearby (one under review, one under appeal, one waiting for a hearing date, one other).
Data as of Nov 8, 2026 · Every item lists its source
- Added a garden suite (completed Mar 2026).
- Outside TRCA flood hazard areas.
- 4 planning applications within 250 m: one under review, one under appeal, one waiting for a hearing date, one other.
03The building
11 building permits in the last 5 years, for 3 projects. This includes a garden suite, completed Mar 2026. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 4 projects from 13 permits
- Garden suiteNew home · completed Mar 4, 2026
Revision 01 - Minor revision to site plan.Proposal to convert existing garage into garden suite · 3 permits in this project (such as building, plumbing and heating) · Permit 24 248510 - Addition · completed Mar 4, 2026
Rev 01: Changes to building/addition length and third floor terrace · 4 permits in this project (such as building, plumbing and heating) · Permit 22 155208 - Interior Alterations · completed Jul 13, 2023
Rev 01: change to layout, underpinning added to basement alterations · 4 permits in this project (such as building, plumbing and heating) · Permit 21 124082 - Accessory Building(s) · completed Oct 21, 2025
Revision to garage doors, dormer and structure. See related work at 52 Heath (01 134783 BLD 01). · 2 permits in this project (such as building, plumbing and heating) · Permit 01 134796
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4T, 2 of 98 home tap-water samples (2.0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4T is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 7 samples here (7.1%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
4 active planning applications within 250 m (about a 3-minute walk): one under review, one under appeal, one waiting for a hearing date, one other. That's about typical for Toronto (the typical address has 1).
- 147 Alvin Ave · 54 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To alter the existing two-storey semi-detached dwelling by constructing a north side addition, south side addition, a south side basement walkout and re-constructing the rear deck.File A0594/21TEY · submitted Apr 25, 2021 - 21495 Yonge St · 232 m awaySubdivision: a request to divide land into new lots and streets
City planners are reviewing it. Residents can comment before a decision is made.
Draft Plan of Subdivision for 4 blocks.File 21 226522 STE 12 SB · submitted Oct 15, 2021 · City record - 31495 Yonge St · 232 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Application to amend the Official Plan and Zoning By-law to permit a mixed-use development consisting of four residential buildings 44, 39, 27, and 13-storeys, a new park at the northwest corner of the site, a courtyard privately owned…File 19 134851 STE 12 OZ · submitted Apr 3, 2019 · City record - 41560 Yonge St · 243 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on May 27, 2026. It has been appealed to the Toronto Local Appeal Body (TLAB), which will hold its own hearing and make the final decision.
To construct a new three-storey non-residential building (including a mezzanine level), with various uses such as: adaptable spaces for community-oriented and commercial uses, a convertible auditorium space, an atrium gathering area,…File A0272/26TEY · submitted Apr 1, 2026
1 home within 250 m is registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: garbage, green bin and yard waste. November 18: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 50 Heath St E
Is 50 Heath St E in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 50 Heath St E?
There are 4 active planning applications within 250 metres (one under review, one under appeal, one waiting for a hearing date, one other). The closest is at 47 Alvin Ave, 54 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 50 Heath St E been renovated?
Yes. The City has 13 building permits on record, 11 in the last 5 years. They include a garden suite. Source: Building Permits.
Is 50 Heath St E a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 50 Heath St E?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 11, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location