51 Sammon Ave
51 Sammon Ave is in Danforth East York. It's outside TRCA flood hazard areas and there are 3 planning applications nearby (one approved, one hearing on Nov 25, one hearing on Dec 2).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 3 planning applications within 250 m: one approved, one hearing on Nov 25, one hearing on Dec 2.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 5 permits
- Addition, deck or porch and more · completed Oct 23, 2020
REVISION - structural changes to flat roof detailsProposed interior alterations (83.9m2) rear one-storey addition (104.19m2) with rooftop solar photovoltaic panels and rear deck, · 5 permits in this project (such as building, plumbing and heating) · Permit 18 246018
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4J, 22 of 911 home tap-water samples (2.4%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4J is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 44 samples here (4.8%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
3 active planning applications within 250 m (about a 3-minute walk): one approved, one hearing on Nov 25, one hearing on Dec 2. That's about typical for Toronto (the typical address has 1).
- 1169 Woodycrest Ave · 196 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Oct 25, 2023.
To alter the existing two-storey semi-detached dwelling by constructing a new front porch, which will be enclosed and to reconstruct the front stairs.File A0781/23TEY · submitted Sep 7, 2023 - 288 Woodycrest Ave · 210 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
A public hearing is set for Nov 25, 2026 at 2:00 p.m.. Neighbours can send comments or speak at the hearing.
To construct a new one-storey detached ancillary building (shed) in the rear yard. The existing one-storey detached ancillary building (shed) will be demolished.File A0590/26TEY · submitted Aug 11, 2026 - 3108 Eaton Ave · 226 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
A public hearing is set for Dec 2, 2026 at 9:30 a.m.. Neighbours can send comments or speak at the hearing.
To alter the existing two-storey detached dwelling by constructing a new rear one-storey addition with a deck and stairs. The existing rear one-storey enclosed glass addition will be demolished.File A0429/26TEY · submitted Jun 2, 2026
11 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at 9 in 10 Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 51 Sammon Ave
Is 51 Sammon Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 51 Sammon Ave?
There are 3 active planning applications within 250 metres (one approved, one hearing on Nov 25, one hearing on Dec 2). The closest is at 169 Woodycrest Ave, 196 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 51 Sammon Ave been renovated?
Yes. The City has 5 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 51 Sammon Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 51 Sammon Ave?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location