54 Atomic Ave
An address in Etobicoke City Centre, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
01The building
Recent permits (8)
- Addition(s) · Inspection · Dec 18, 2025
Proposal to construct a large addition onto existing industrial building. · Permit 25 163040 BLD - Building Permit Related(MS) · Permit Issued · Dec 18, 2025
HVAC - Proposal to construct a large addition onto existing industrial building. · Permit 25 163040 HVA - Partial Permit - Foundation · Closed · Dec 18, 2025
Part Permit - Proposal to construct a large addition onto existing industrial building. · Permit 25 163040 FND - Partial Permit - Structural Framing · Closed · Dec 18, 2025
Part Permit - Proposal to construct a large addition onto existing industrial building. · Permit 25 163040 STR - Addition(s) · Closed · Nov 23, 2021
NEW CONVEYOR ENCLOSURE AND NEW LOADING DOCKS WITH FOUR NEW OVERHEAD DOORS · Permit 21 192495 BLD - Building Permit Related(MS) · Closed · Nov 23, 2021
HVAC - NEW CONVEYOR ENCLOSURE AND NEW LOADING DOCKS WITH FOUR NEW OVERHEAD DOORS · Permit 21 192495 HVA - Special Ventilation System · Permit Issued · Jul 26, 2018
HVAC - Proposal to construct new roof openings and interior alterations for new dust collector system. · Permit 18 144848 HVA - Multiple Projects · Closed · May 28, 2018
Proposal to construct new roof openings and interior alterations for new dust collector system. · Permit 18 144848 BLD
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
No active development or Committee of Adjustment applications within 250 metres.
Development Applications; Committee of Adjustment Applications · 0 registered short-term rentals within 250 m.
04City services
05Quick answers about 54 Atomic Ave
Is 54 Atomic Ave in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 54 Atomic Ave?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 54 Atomic Ave?
Collection calendar Wednesday 2. Next garbage pickup: Nov 11, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location