55 Kelfield St
An address in West Humber-Clairville, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
01The building
Recent permits (8)
- Sign Building Permit Related · Cancelled · Aug 4, 2026
To erect and display two illuminated wall signs.***MAPLE LEAF SELF STORAGE*** · Permit 26 213868 DST - Fire Alarm · Closed · Jan 29, 2026
Proposal to replace fire alarm control panel; no expansion or modification to the existing field devices/coverage is proposed. · Permit 26 108675 FSU - Building Permit Related(PS) · Closed · Feb 10, 2020
Revision 01: modifications to the plumbing sizePlumbing - Proposed 4 storey addition to an existing three storey self storage buidling. · Permit 17 193682 PLB - New Building · Closed · Dec 13, 2019
Construct new single storey non-climate controlled drive up self storage building H · Permit 19 154223 BLD - Addition(s) · Closed · Jan 22, 2019
Rev 01: Revision to the column fire proofing material and wall assembly AU barrier product as per bubbled areas.Proposed 4 storey addition to an existing three storey self storage buidling. · Permit 17 193682 BLD - Inside and Outside Drains · Closed · Mar 1, 2018
Drain - Proposed 4 storey addition to an existingthree storey self storage buidling. · Permit 17 193682 STS - Addition(s) · Closed · Feb 27, 2018
Proposed 4 storey addition to an existing three storey self storage buidling. · Permit 17 193682 BLD - Building Permit Related(MS) · Closed · Feb 27, 2018
HVAC - Proposed 4 storey addition to an existingthree storey self storage buidling. · Permit 17 193682 HVA
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
No active development or Committee of Adjustment applications within 250 metres.
Development Applications; Committee of Adjustment Applications · 1 registered short-term rentals within 250 m.
04City services
05Quick answers about 55 Kelfield St
Is 55 Kelfield St in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 55 Kelfield St?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 55 Kelfield St?
Collection calendar Thursday 1. Next garbage pickup: Nov 19, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location