58 Sutherland Dr
An address in Leaside-Bennington, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
- 0 active development applications and 3 Committee of Adjustment applications within 250 m.
01The building
Recent permits (2)
- Building Permit Related(PS) · Inspection · Apr 26, 2018
Plumbing - Proposed interior alterations to first floor, replace rear entrance door and window with new sliding patio door, remove existing exterior door in the master bedroom and replace with a… · Permit 18 143449 PLB - Multiple Projects · Inspection · Apr 25, 2018
Proposed interior alterations to first floor, replace rear entrance door and window with new sliding patio door, remove existing exterior door in the master bedroom and replace with a window, and… · Permit 18 143449 BLD
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
- 136 Rolph Rd · 116 m · Committee of Adjustment · Minor variance · Approved with ConditionsTo construct a new rear and second storey addition to the existing dwelling.File A0389/17NY · submitted Apr 12, 2017
- 224 Sutherland Dr · 231 m · Committee of Adjustment · Minor variance · Approved with ConditionsTo legalize and maintain the front yard soft landscaping area.File A0373/23NY · submitted Jun 6, 2023
- 324 Sutherland Dr · 231 m · Committee of Adjustment · Minor variance · OMB AppealTo construct a new two-storey detached dwelling with an integral, below grade, one car garage. The existing dwelling and detached garage would be demolished. Please be advised this application was previously before the Committee of…File A890/14NY · submitted Nov 13, 2014
Development Applications; Committee of Adjustment Applications · 1 registered short-term rentals within 250 m.
04City services
05Quick answers about 58 Sutherland Dr
Is 58 Sutherland Dr in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 58 Sutherland Dr?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 58 Sutherland Dr?
Collection calendar Thursday 2. Next garbage pickup: Nov 12, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives


Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location