584 Huron St

584 Huron St is in Annex. It's outside TRCA flood hazard areas and there are 5 planning applications nearby (three under appeal, two approved).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 5 planning applications within 250 m: three under appeal, two approved.
Building permits0in the last 5 years
Applications nearby5active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 10garbage, green bin and yard waste
Spadina RdBedford RdSt George StBernard AveWells StKendal AveWalmer RdLowther AveAdmiral RdTranby AveBoswell AveElgin AveHuron StMadison Ave12345Map data: City of Toronto (Toronto Centreline)Spadina RdSt George StBernard AveHuron StMadison AveLowther Ave12345Map data: City of Toronto (Toronto Centreline)
The red dot is 584 Huron St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 3 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 2 projects from 3 permits
  • Interior Alterations · inspection · issued Sep 19, 2018
    Proposed interior alterations to the basement and ground floor of existing 4 unit dwelling. · 2 permits in this project (such as building, plumbing and heating) · Permit 18 210048
  • Interior Alterations · completed Aug 13, 2018
    Interior alterations to existing and proposed SFD-semi detached. New use: 4 dwelling unit building.Refer to OMB file #V000257 · Permit 04 204253

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M5R1.6% of tests above Ontario's limitYour area · M5RNon Regulated Lead Sample · 253 tests, Jan 22, 2014 to Aug 27, 2026

In postal area M5R, 4 of 253 home tap-water samples (1.6%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5R is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 8 samples here (3.2%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

5 active planning applications within 250 m (about a 3-minute walk): three under appeal, two approved. That's more than at most Toronto addresses (the typical address has 1).

  1. 1
    266 St George St · 54 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Appealed on April 24, 2026.Combined Official Plan & Zoning By-law Amendment for an 18-storey building containing 121 dwelling units, and the adaptive re-use of the heritage listed buildings at 262 and 264 St. George Street.
    File 25 102375 STE 11 OZ · submitted Jan 8, 2025 · City record
  2. 2
    264 St George St · 67 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Appealed on April 24, 2026.Combined Official Plan & Zoning By-law Amendment for an 18-storey building containing 121 dwelling units, and the adaptive re-use of the heritage listed buildings at 262 and 264 St. George Street.
    File 25 102375 STE 11 OZ · submitted Jan 8, 2025 · City record
  3. 3
    262 St George St · 78 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Appealed on April 24, 2026.Combined Official Plan & Zoning By-law Amendment for an 18-storey building containing 121 dwelling units, and the adaptive re-use of the heritage listed buildings at 262 and 264 St. George Street.
    File 25 102375 STE 11 OZ · submitted Jan 8, 2025 · City record
  4. 4
    321 Davenport Rd · 211 m away
    Condominium: a request to divide a building into condominium units

    It has been approved.

    *** Draft Plan of Condominium for 23 residential units in a 9-storey residential building.
    File 21 231473 STE 11 CD · submitted Oct 28, 2021 · City record
  5. 5
    361 Davenport Rd · 217 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    Applicant requested file closure- please see email chain in the 'Attachment' tab.Proposal for a 7-storey mixed use building with 16 dwelling units and commercial (office) component fronting on Davenport Road.
    File 20 195242 STE 11 SA · submitted Sep 17, 2020 · City record
Short-term rentals nearby10 registered homesWithin 250 mShort Term Rentals Registration

10 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingTuesdaysThis addressSolid Waste Collection Schedule

Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorDianne SaxeWard 11Councillor_Saxe@toronto.ca · 416-392-4009

05Quick answers about 584 Huron St

Is 584 Huron St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 584 Huron St?

There are 5 active planning applications within 250 metres (three under appeal, two approved). The closest is at 266 St George St, 54 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 584 Huron St been renovated?

Yes. The City has 3 building permits on record, 0 in the last 5 years. Source: Building Permits.

Is 584 Huron St a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 584 Huron St?

Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Bernard Avenue near Huron — garage
1913 · 119 m awayBernard Avenue near Huron — garageCity of Toronto Archives, Fonds 200, Series 372, Subseries 1, Item 52
Huron Street looking north from south side of Bernard Avenue
1949 · 119 m awayHuron Street looking north from south side of Bernard AvenueCity of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 1911
Bernard Avenue near Huron — garage
1913 · 119 m awayBernard Avenue near Huron — garageCity of Toronto Archives, Fonds 200, Series 372, Subseries 1, Item 51
Bernard Ave. corner of Madison asphalt pavement damaged by trucks
1922 · 138 m awayBernard Ave. corner of Madison asphalt pavement damaged by trucksCity of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 990
212 St. George Street
1922 · 153 m away212 St. George StreetCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 491
Apartment building, 276 St. George Street, north of Bernard Avenue
1950 · 193 m awayApartment building, 276 St. George Street, north of Bernard AvenueCity of Toronto Archives, Fonds 492, Item 159
Bernard Ave., corner Spadina Rd. Asphalt pavement damaged by trucks
1922 · 210 m awayBernard Ave., corner Spadina Rd. Asphalt pavement damaged by trucksCity of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 992
Bernard Ave., Spadina Rd. West (Asphalt damaged by trucks)
1922 · 210 m awayBernard Ave., Spadina Rd. West (Asphalt damaged by trucks)City of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 994
Bernard Ave., Spadina Rd. West
1922 · 210 m awayBernard Ave., Spadina Rd. WestCity of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 993

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

584 Huron St, Toronto M5R: permits, flood risk and what's planned nearby · My Address in Toronto