59 Squires Ave
59 Squires Ave is in O'Connor-Parkview. It's outside TRCA flood hazard areas and there are 3 planning applications nearby (two approved, one waiting for a hearing date).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 3 planning applications within 250 m: two approved, one waiting for a hearing date.
03The building
0 building permits in the last 5 years. Together they added 1 new home. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 2 permits
- Addition and interior renovation · completed Sep 18, 2024
Proposal to alter the existing one-storey detached dwelling by constructing a complete second storey addition with a rear covered balcony and interior alterations to convert dwelling into a duplex.… · 2 permits in this project (such as building, plumbing and heating) · Permit 24 162631
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4B, 2 of 166 home tap-water samples (1.2%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4B is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (3.0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
3 active planning applications within 250 m (about a 3-minute walk): two approved, one waiting for a hearing date. That's about typical for Toronto (the typical address has 1).
- 18 Holmstead Ave · 70 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The Committee of Adjustment approved it on Jan 28, 2026.
To obtain consent to sever the property into two undersized residential lots and to maintain existing easements/rights-of-way.File B0041/25TEY · submitted Jun 19, 2025 - 22915 St Clair Ave E · 164 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
Proposing to add a vehicle dealership that would use 3/7 parking spaces on the existing lot. The existing autobody repair shop is a legal non-conforming use.File A1217/22TEY · submitted Oct 3, 2022 - 368 Glencrest Blvd · 221 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Dec 13, 2023.
To alter the existing one-storey ancillary building (detached garage, abutting Glencrest Boulevard and Squires Avenue) by constructing a second storey addition to contain a garden suite. There will be an exterior staircase along the north…File A0959/23TEY · submitted Oct 20, 2023
3 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 12: garbage, green bin and yard waste. November 19: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 59 Squires Ave
Is 59 Squires Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 59 Squires Ave?
There are 3 active planning applications within 250 metres (two approved, one waiting for a hearing date). The closest is at 8 Holmstead Ave, 70 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 59 Squires Ave been renovated?
Yes. The City has 2 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 59 Squires Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 59 Squires Ave?
Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 12, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location