6 Sullivan St
6 Sullivan St is in Kensington-Chinatown. It's outside TRCA flood hazard areas and there are 4 planning applications nearby (three waiting for a hearing date, one approved).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 4 planning applications within 250 m: three waiting for a hearing date, one approved.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 1 permit
- Addition(s) · inspection · issued Jul 2, 2015
To construct interior alterations and a one storey addition (13m2) · Permit 15 110202
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M5T, 0 of 85 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5T is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 1 samples here (1.2%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
4 active planning applications within 250 m (about a 3-minute walk): three waiting for a hearing date, one approved. That's about typical for Toronto (the typical address has 1).
- 134 Sullivan St · 83 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Aug 12, 2026.
To construct a new two-storey detached ancillary building containing two laneway suites with a second level south canopy, in the rear yard, abutting Orphanage Mews laneway on the north side, and North Sullivan East Huron laneway on the…File A0450/26TEY · submitted Jun 18, 2026 - 249 Grange Ave · 132 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To convert the basement and first storey from a personal service shop to a second dwelling unit.File A0728/21TEY · submitted May 7, 2021 - 3403 Dundas St W · 187 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To alter the existing two-storey mixed-use building by constructing a complete third and fourth storey addition and a rear four-storey addition. This building will contain commercial uses on the first and second storeys, and a total of…File A0011/24TEY · submitted Dec 29, 2023 - 4317 Dundas St W · 224 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The hearing was postponed. A new date hasn't been published yet.
To obtain consent to sever a portion of land for the purpose of a lot addition, as well as to create and maintain easements/rights-of-way.File B0063/26TEY · submitted Oct 13, 2026
13 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at 9 in 10 Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 6 Sullivan St
Is 6 Sullivan St in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 6 Sullivan St?
There are 4 active planning applications within 250 metres (three waiting for a hearing date, one approved). The closest is at 34 Sullivan St, 83 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 6 Sullivan St been renovated?
Yes. The City has 1 building permit on record, 0 in the last 5 years. Source: Building Permits.
Is 6 Sullivan St a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 6 Sullivan St?
Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location