Skip to content
My Address in Toronto
Address report

60 Dundas St E

60 Dundas St E is in Downtown Yonge East. It's outside TRCA flood hazard areas and there are 15 planning applications nearby (six under review, five under appeal, three approved, one other).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 15 planning applications within 250 m: six under review, five under appeal, three approved, one other.
Building permits1in the last 5 years
Applications nearby15active, within 250 m
Flood hazardOutsideTRCA mapping
HeritageNot listedCity Heritage Register
Yonge StBay StDundas StJarvis StShuter StChurch StElm StDundas SqGould StMutual StDalhousie StBond StVictoria St123456789101112Map data: City of Toronto (Toronto Centreline)Yonge StDundas StShuter StChurch StDundas SqGould StDalhousie StMutual StBond StVictoria St123456789101112Map data: City of Toronto (Toronto Centreline)
The red dot is 60 Dundas St E. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years1 permitThis addressBuilding Permits · 3 on record

1 building permit in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 3 projects from 3 permits
  • Demolition · permit issued · issued Mar 2, 2026
    Proposal to demolish existing 3 storey mixed use building in relation to new 21 storey student residence development · Permit 26 114740
  • Interior Alterations · completed May 29, 2026
    proposal for alterations to second floor to office use, block off access to 3rd floor and make 3rd floor inaccessible.Existing: Mixed Use Building (Residential on second floor). Proposed:… · Permit 25 242471
  • Backflow Prevention Devices (Water only) · completed Sep 14, 2021
    Proposal to install one backflow prevention device · Permit 09 172633

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M5B0% of tests above Ontario's limitYour area · M5BNon Regulated Lead Sample · 17 tests, Jun 6, 2014 to Jun 27, 2025

In postal area M5B, 0 of 17 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). That's too few samples to compare with the rest of the city. Health Canada recommends a stricter limit of 5 micrograms per litre: 1 samples here (5.9%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

15 active planning applications within 250 m (about a 3-minute walk): six under review, five under appeal, three approved, one other. That's more than at 9 in 10 Toronto addresses.

  1. 1
    50 Gerrard St E · 207 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that…
    File 22 227434 STE 13 SA · submitted Nov 8, 2022 · City record
  2. 2
    50 Gerrard St E · 207 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey…
    File 22 227435 STE 13 OZ · submitted Nov 8, 2022 · City record
  3. 3
    335 Yonge St · 228 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Official Plan and Zoning By-law Amendment Application for a proposed 30-storey mixed-use building comprised of 165 residential dwelling units, 2096 square metres of non-residential floor area and 222 below grade bicycle parking spaces.
    File 19 249699 STE 13 OZ · submitted Nov 15, 2019 · City record
  4. 4
    335 Yonge St · 228 m away
    Subdivision: a request to divide land into new lots and streets

    City planners are reviewing it. Residents can comment before a decision is made.

    1 block
    File 21 235404 STE 13 SB · submitted Nov 8, 2021 · City record
  5. 5
    396 Church St · 234 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey…
    File 22 227435 STE 13 OZ · submitted Nov 8, 2022 · City record
  6. 6
    396 Church St · 234 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that…
    File 22 227434 STE 13 SA · submitted Nov 8, 2022 · City record
  7. 7
    398 Church St · 235 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that…
    File 22 227434 STE 13 SA · submitted Nov 8, 2022 · City record
  8. 8
    398 Church St · 235 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey…
    File 22 227435 STE 13 OZ · submitted Nov 8, 2022 · City record
  9. 9
    369 Yonge St · 240 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    Site Plan Application to permit the construction of a 85-storey mixed-use development. The proposal entails 96,532 m2 of residential GFA and 7,440 m2 non-residential GFA. A total of 1,415 residential units are proposed.
    File 19 113000 STE 13 SA · submitted Feb 7, 2019 · City record
  10. 10
    73 Mcgill St · 240 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that…
    File 22 227434 STE 13 SA · submitted Nov 8, 2022 · City record
  11. 11
    73 Mcgill St · 240 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey…
    File 22 227435 STE 13 OZ · submitted Nov 8, 2022 · City record
  12. 12
    77 Mcgill St · 240 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that…
    File 22 227434 STE 13 SA · submitted Nov 8, 2022 · City record
Short-term rentals nearby75 registered homesWithin 250 mShort Term Rentals Registration

75 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage daySee calendarThis addressSolid Waste Collection Schedule
City councillorChris MoiseWard 13Councillor_Moise@toronto.ca · 416-392-7903

05Quick answers about 60 Dundas St E

Is 60 Dundas St E in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 60 Dundas St E?

There are 15 active planning applications within 250 metres (six under review, five under appeal, three approved, one other). The closest is at 50 Gerrard St E, 207 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 60 Dundas St E been renovated?

Yes. The City has 3 building permits on record, 1 in the last 5 years. Source: Building Permits.

Is 60 Dundas St E a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Mackenzie, William Lyon, house, Bond St., w. side, s. of Dundas St. E.
1930 · 32 m awayMackenzie, William Lyon, house, Bond St., w. side, s. of Dundas St. E. Courtesy of Toronto Public Library
Close view of window on Bond Street, north of Dundas Street
1975 · 32 m awayClose view of window on Bond Street, north of Dundas StreetCity of Toronto Archives, Fonds 1526, File 7, Item 95
Bond St Temple - Dundas St view, gargoyles sold
1981 · 32 m awayBond St Temple - Dundas St view, gargoyles soldCity of Toronto Archives, Fonds 1526, File 28, Item 22
View of Dundas Street East looking east from Bond Street
1977 · 32 m awayView of Dundas Street East looking east from Bond StreetCity of Toronto Archives, Fonds 1526, File 71, Item 119
View of demolition of a Lennox building on Bond Street, north of Dundas Street
1981 · 32 m awayView of demolition of a Lennox building on Bond Street, north of Dundas StreetCity of Toronto Archives, Fonds 1526, File 7, Item 100
Mackenzie, William Lyon, house, Bond St., w. side, s. of Dundas St. E.
1953 · 32 m awayMackenzie, William Lyon, house, Bond St., w. side, s. of Dundas St. E. Courtesy of Toronto Public Library
View of Dundas Street East looking west from Bond Street
1977 · 32 m awayView of Dundas Street East looking west from Bond StreetCity of Toronto Archives, Fonds 1526, File 71, Item 120
Bond St Temple at Dundas St
1981 · 32 m awayBond St Temple at Dundas StCity of Toronto Archives, Fonds 1526, File 28, Item 8
View of Ryserson Copy shop at 113 Bond Street, north of Dundas Street
1975 · 32 m awayView of Ryserson Copy shop at 113 Bond Street, north of Dundas StreetCity of Toronto Archives, Fonds 1526, File 7, Item 98

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

60 Dundas St E, Toronto M5B: permits, flood risk and what's planned nearby · My Address in Toronto