614 Huron St is in Annex, on the City's Heritage Register. It's outside TRCA flood hazard areas and there are 6 planning applications nearby (three approved, three under appeal).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • It is listed on the Heritage Register, which flags heritage value without full designation.
  • Outside TRCA flood hazard areas.
  • 6 planning applications within 250 m: three approved, three under appeal.
Building permits0in the last 5 years
Applications nearby6active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 10garbage, green bin and yard waste
St George StDupont StSpadina RdBedford RdDavenport RdWalmer RdBernard AveAdmiral RdKendal AveTranby AvePears AveMadison Ave123456Map data: City of Toronto (Toronto Centreline)Dupont StSt George StSpadina RdBernard AveMadison AveAdmiral RdHuron St123456Map data: City of Toronto (Toronto Centreline)
The red dot is 614 Huron St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 0 on record

The City has no building permits on record for this address. About 9 in 10 Toronto addresses also had none in the last 5 years.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusListedThis addressHeritage Register

It is listed on the Heritage Register, which flags heritage value without full designation. Owners must give the City 60 days' notice before demolition.

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M5R1.6% of tests above Ontario's limitYour area · M5RNon Regulated Lead Sample · 253 tests, Jan 22, 2014 to Aug 27, 2026

In postal area M5R, 4 of 253 home tap-water samples (1.6%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5R is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 8 samples here (3.2%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

6 active planning applications within 250 m (about a 3-minute walk): three approved, three under appeal. That's more than at most Toronto addresses (the typical address has 1).

  1. 1
    361 Davenport Rd · 135 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    Applicant requested file closure- please see email chain in the 'Attachment' tab.Proposal for a 7-storey mixed use building with 16 dwelling units and commercial (office) component fronting on Davenport Road.
    File 20 195242 STE 11 SA · submitted Sep 17, 2020 · City record
  2. 2
    266 St George St · 214 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Appealed on April 24, 2026.Combined Official Plan & Zoning By-law Amendment for an 18-storey building containing 121 dwelling units, and the adaptive re-use of the heritage listed buildings at 262 and 264 St. George Street.
    File 25 102375 STE 11 OZ · submitted Jan 8, 2025 · City record
  3. 3
    115 Dupont St · 225 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    The Proposed Building for 115 Dupont st. is a Group D 5 storey office building with a typical floor plate of 213 m2 and a gross floor area of 884 m2.The proposed building will contain 4 office units, one per floor, and includes 5 parking…
    File 15 268295 STE 20 SA · submitted Dec 22, 2015 · City record
  4. 4
    264 St George St · 229 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Appealed on April 24, 2026.Combined Official Plan & Zoning By-law Amendment for an 18-storey building containing 121 dwelling units, and the adaptive re-use of the heritage listed buildings at 262 and 264 St. George Street.
    File 25 102375 STE 11 OZ · submitted Jan 8, 2025 · City record
  5. 5
    262 St George St · 238 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Appealed on April 24, 2026.Combined Official Plan & Zoning By-law Amendment for an 18-storey building containing 121 dwelling units, and the adaptive re-use of the heritage listed buildings at 262 and 264 St. George Street.
    File 25 102375 STE 11 OZ · submitted Jan 8, 2025 · City record
  6. 6
    321 Davenport Rd · 239 m away
    Condominium: a request to divide a building into condominium units

    It has been approved.

    *** Draft Plan of Condominium for 23 residential units in a 9-storey residential building.
    File 21 231473 STE 11 CD · submitted Oct 28, 2021 · City record
Short-term rentals nearby11 registered homesWithin 250 mShort Term Rentals Registration

11 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at 9 in 10 Toronto addresses.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingTuesdaysThis addressSolid Waste Collection Schedule

Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorDianne SaxeWard 11Councillor_Saxe@toronto.ca · 416-392-4009

05Quick answers about 614 Huron St

Is 614 Huron St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 614 Huron St?

There are 6 active planning applications within 250 metres (three approved, three under appeal). The closest is at 361 Davenport Rd, 135 m away. Source: Development Applications; Committee of Adjustment Applications.

Is 614 Huron St a heritage property?

Yes. It is listed on the Heritage Register, which flags heritage value without full designation. Owners must give the City 60 days' notice before demolition. Source: Heritage Register.

When is garbage day at 614 Huron St?

Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Bernard Avenue near Huron — garage
1913 · 59 m awayBernard Avenue near Huron — garageCity of Toronto Archives, Fonds 200, Series 372, Subseries 1, Item 52
Huron Street looking north from south side of Bernard Avenue
1949 · 59 m awayHuron Street looking north from south side of Bernard AvenueCity of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 1911
Bernard Avenue near Huron — garage
1913 · 59 m awayBernard Avenue near Huron — garageCity of Toronto Archives, Fonds 200, Series 372, Subseries 1, Item 51
Bernard Ave. corner of Madison asphalt pavement damaged by trucks
1922 · 92 m awayBernard Ave. corner of Madison asphalt pavement damaged by trucksCity of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 990
Apartment building, 276 St. George Street, north of Bernard Avenue
1950 · 162 m awayApartment building, 276 St. George Street, north of Bernard AvenueCity of Toronto Archives, Fonds 492, Item 159
St. George St., w. side, rear of premises, from Dupont St. to Bernard Ave.; looking east.
1890 · 170 m awaySt. George St., w. side, rear of premises, from Dupont St. to Bernard Ave.; looking east. Courtesy of Toronto Public Library
Bernard Ave., corner Spadina Rd. Asphalt pavement damaged by trucks
1922 · 181 m awayBernard Ave., corner Spadina Rd. Asphalt pavement damaged by trucksCity of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 992
Bernard Ave., Spadina Rd. West (Asphalt damaged by trucks)
1922 · 181 m awayBernard Ave., Spadina Rd. West (Asphalt damaged by trucks)City of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 994
Bernard Ave., Spadina Rd. West
1922 · 181 m awayBernard Ave., Spadina Rd. WestCity of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 993

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

614 Huron St, Toronto M5R: permits, flood risk and what's planned nearby · My Address in Toronto