65 Millicent St
65 Millicent St is in Junction-Wallace Emerson. It's outside TRCA flood hazard areas and there are 10 planning applications nearby (five under review, two under appeal, two approved, one other).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 10 planning applications within 250 m: five under review, two under appeal, two approved, one other.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 1 permit
- Garage · completed Oct 29, 2026
Construct detached garage at rear · Permit 02 122733
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M6H, 13 of 538 home tap-water samples (2.4%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6H is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 25 samples here (4.6%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
10 active planning applications within 250 m (about a 3-minute walk): five under review, two under appeal, two approved, one other. That's more than at 9 in 10 Toronto addresses.
- 198 Millicent St · 69 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To legalize and to maintain the existing two-storey ancillary building (containing two laneway suites), abutting the laneway, which was constructed beyond the limits of the authorized building permit. The ground level garage within the…File A0068/25TEY · submitted Jan 27, 2025 - 21260 Dufferin St · 104 m awayPart Lot Control: a request to divide a block into separate lots, often for townhouses
City planners are reviewing it. Residents can comment before a decision is made.
Part Lot Control applicationFile 21 129062 STE 09 PL · submitted Mar 18, 2021 · City record - 31260 Dufferin St · 104 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Official Plan and Zoning By-law Amendment to increase the approved height and density onsite to accomodate additional purpose built and affordable rental dwelling units. On Block 3, Tower 3A increases by 13 storeys and Tower 3B increases…File 22 130626 STE 09 OZ · submitted Apr 5, 2022 · City record - 41260 Dufferin St · 104 m awaySubdivision: a request to divide land into new lots and streets
City planners are reviewing it. Residents can comment before a decision is made.
Draft Plan of Subdivision to support the implementation of the OPA/ZBA applications for the site:a total of ±2,846 residential units in a mix of housing forms including ±2685 residential units and 150 affordable rental units; ±27,503m2 of…File 18 214150 STE 18 SB · submitted Aug 23, 2018 · City record - 51245 Dupont St · 136 m awayPart Lot Control: a request to divide a block into separate lots, often for townhouses
City planners are reviewing it. Residents can comment before a decision is made.
Part Lot Control applicationFile 21 129062 STE 09 PL · submitted Mar 18, 2021 · City record - 61245 Dupont St · 136 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Official Plan and Zoning By-law Amendment to increase the approved height and density onsite to accomodate additional purpose built and affordable rental dwelling units. On Block 3, Tower 3A increases by 13 storeys and Tower 3B increases…File 22 130626 STE 09 OZ · submitted Apr 5, 2022 · City record - 71245 Dupont St · 136 m awaySubdivision: a request to divide land into new lots and streets
City planners are reviewing it. Residents can comment before a decision is made.
Draft Plan of Subdivision to support the implementation of the OPA/ZBA applications for the site:a total of ±2,846 residential units in a mix of housing forms including ±2685 residential units and 150 affordable rental units; ±27,503m2 of…File 18 214150 STE 18 SB · submitted Aug 23, 2018 · City record - 81245 Dupont St · 136 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Control application for Block 3A of 1245 Dupont Street that includes the construction of a 50 storey (156.95 metres) market rental building with 588 units and at grade retail. The building will have a total GFA of 41,239 square…File 26 134638 STE 09 SA · submitted Mar 25, 2026 · City record - 921 Lappin Ave · 163 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Dec 6, 2023.
To construct a two-storey semi-detached ancillary building (laneway suite) in the rear yard of the three-storey semi-detached triplex currently under construction, as approved by Minor Variance Decision A1149/19TEY. There will be a total…File A0859/23TEY · submitted Sep 21, 2023 - 1019 Lappin Ave · 167 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Dec 6, 2023.
To construct a two-storey semi-detached ancillary building (laneway suite) in the rear yard of the three-storey semi-detached triplex currently under construction, as approved by Minor Variance Decision A1147/19TEY. There will be a total…File A0860/23TEY · submitted Sep 21, 2023
8 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: recycling and green bin. November 20: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 65 Millicent St
Is 65 Millicent St in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 65 Millicent St?
There are 10 active planning applications within 250 metres (five under review, two under appeal, two approved, one other). The closest is at 98 Millicent St, 69 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 65 Millicent St been renovated?
Yes. The City has 1 building permit on record, 0 in the last 5 years. Source: Building Permits.
Is 65 Millicent St a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 65 Millicent St?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 20, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location