65 Pine Cres
An address in The Beaches, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
01The building
Recent permits (8)
- Building Permit Related(MS) · Closed · Jun 20, 2023
HVAC - proposed remove existing 2nd floor balcony, construct new washroom addition in its place · Permit 23 110556 HVA - Addition(s) · Inspection · Feb 16, 2023
proposed remove existing 2nd floor balcony, construct new washroom addition in its place · Permit 23 110556 BLD - Building Permit Related(PS) · Closed · Feb 16, 2023
Plumbing - proposed remove existing 2nd floor balcony, construct new washroom addition in its place · Permit 23 110556 PLB - Garage · Inspection · Dec 23, 2008
permit for detached garage (with green roof (no interior access)) at rear of existing SFD detached house · Permit 08 228268 BLD - Multiple Projects · Revision Issued · Mar 7, 2006
Proposal to extend a small portion of side addition & extend porch roof above (west side), and extend the stair out on the 2nd floor (east side). New density = 1.89 sq.m. Note: C.O.A. approved… · Permit 05 193079 BLD - Building Permit Related(MS) · Revision Issued · Jan 18, 2006
See BLD 05-193079-01 as per C of A decisionHVAC - Proposed rear yard 1 storey addition with a walk-out basement, reconstruct front porch with addition to porch at side, interior alterations to all… · Permit 05 193079 HVA - Multiple Projects · Revision Issued · Jan 13, 2006
Revision as per C of A decision A0820/05TEY to construct a two storey addition at rear of existing 2 storey detached house. Addition will include a deck from 1st floor. Also, a covered front porch… · Permit 05 193079 BLD - Building Permit Related(PS) · Inspection · Jan 5, 2006
Plumbing - Proposed rear yard 1 storey addition with a walk-out basement, reconstruct front porch with addition to porch at side, interior alterations to all floors. Applicant has been in contact… · Permit 05 193079 PLB
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
No active development or Committee of Adjustment applications within 250 metres.
Development Applications; Committee of Adjustment Applications · 1 registered short-term rentals within 250 m.
04City services
05Quick answers about 65 Pine Cres
Is 65 Pine Cres in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 65 Pine Cres?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 65 Pine Cres?
Collection calendar Tuesday 1. Next garbage pickup: Nov 17, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location