66 Anthony Rd
66 Anthony Rd is in Downsview. It's outside TRCA flood hazard areas and there are 4 planning applications nearby (two deferred, one waiting for a hearing date, one approved).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 4 planning applications within 250 m: two deferred, one waiting for a hearing date, one approved.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 1 permit
- Back Water Valve (Sewer only) · completed Sep 18, 2026
Proposal to install a BWV for existing SFD · Permit 21 119440
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M3K, 0 of 9 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). That's too few samples to compare with the rest of the city. Health Canada recommends a stricter limit of 5 micrograms per litre: 0 samples here (0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
4 active planning applications within 250 m (about a 3-minute walk): two deferred, one waiting for a hearing date, one approved. That's about typical for Toronto (the typical address has 1).
- 153 Winston Park Blvd · 46 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To construct a three-storey fourplex and garden suite in the rear yard with front yard and rear yard parking.File A0244/25NY · submitted Jun 9, 2025 - 283 Anthony Rd · 149 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The City has received it. A hearing date hasn't been set yet.
To construct a second storey addition over the existing dwelling, in conjunction with a one-storey addition to the front of the dwelling.*****WITHDRAWN*****File A0942/17NY · submitted Sep 29, 2017 - 375 Winston Park Blvd · 182 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To alter the existing 1 1/2 storey dwelling by converting it to a 3 storey dwelling with a second unit in the basement. Please note, the file was deferred, on November 6, 2025, to allow appllicant to be present.File A0414/25NY · submitted Oct 2, 2025 - 481 Winston Park Blvd · 236 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Aug 10, 2023.
To construct a new detached dwelling with 2 basement apartment units and a Garden Suite at the rear.File A0337/23NY · submitted Jun 16, 2023
2 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 66 Anthony Rd
Is 66 Anthony Rd in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 66 Anthony Rd?
There are 4 active planning applications within 250 metres (two deferred, one waiting for a hearing date, one approved). The closest is at 53 Winston Park Blvd, 46 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 66 Anthony Rd been renovated?
Yes. The City has 1 building permit on record, 0 in the last 5 years. Source: Building Permits.
Is 66 Anthony Rd a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 66 Anthony Rd?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location