66 Collier St
66 Collier St is in Rosedale-Moore Park. It's outside TRCA flood hazard areas and there are 5 planning applications nearby (three under appeal, two approved).
Data as of Nov 8, 2026 · Every item lists its source
- No fire code violations in open inspections.
- 13 building permits in the last 5 years.
- Outside TRCA flood hazard areas.
- 5 planning applications within 250 m: three under appeal, two approved.
03The building
13 building permits in the last 5 years, for 5 projects. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 12 projects from 24 permits
- Interior Alterations · completed Aug 11, 2026
Proposal for interior alterations. · 2 permits in this project (such as building, plumbing and heating) · Permit 25 229598 - Interior Alterations · completed Sep 22, 2025
REV01: Proposed revision as per drawingsProposed interior alteration of existing condo unit 2D · 3 permits in this project (such as building, plumbing and heating) · Permit 24 128325 - Interior Alterations · revision issued · issued Feb 26, 2025
Revision: There are no changes to the drawings. The revision is necessary because the owner's name and unit number were incorrect. This request is solely to update the owner's name and unit number… · 4 permits in this project (such as building, plumbing and heating) · Permit 25 109921 - Building work · completed Sep 11, 2025
Proposed rooftop railing guard replacement in existing residential condominium. · Permit 24 185350 - Interior Alterations · completed Jul 18, 2025
Proposal for interior alterations to an existing 2-bdrm + study unit (D09), located on Level 9, for work to remove the study space & other minor renovations with the unit. [Existing Condominium… · 2 permits in this project (such as building, plumbing and heating) · Permit 23 203657 - Interior Alterations · completed Sep 8, 2022
Proposal for interior alterations to a 1-bdrm+den unit (D14 or 14D) in an existing condominium building. · 2 permits in this project (such as building, plumbing and heating) · Permit 21 154121 - Interior Alterations · completed Feb 23, 2022
Proposal to convert and existing suite into 2 suites on the 16th floor of the existing apartment building. · 4 permits in this project (such as building, plumbing and heating) · Permit 20 222490 - Interior Alterations · completed Nov 21, 2018
Remove existing sauna and change it to exercise room. · 2 permits in this project (such as building, plumbing and heating) · Permit 18 150059 - Building work · completed Oct 8, 2025
Replacement of standard efficiency boilers, hot water heating boilers and chiller with high efficiency boilers and air cooled chiller. · Permit 18 119106 - Garage Repair/Reconstruction · completed Nov 21, 2018
Parking garage roof slab repair, waterproofing and re-landscaping. · Permit 15 129485 - Garage Repair/Reconstruction · inspection · issued Aug 7, 2009
Proposal for parking structure repairs to existing condominium building (400m2). · Permit 09 153216 - Balcony/Guard Repairs · completed Aug 10, 2026
Proposal to upgrade all balcony railings. · Permit 08 198123
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4W, 1 of 82 home tap-water samples (1.2%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4W is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (6.1%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
5 active planning applications within 250 m (about a 3-minute walk): three under appeal, two approved. That's more than at most Toronto addresses (the typical address has 1).
- 1820 Church St · 84 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Sep 18, 2024.
To alter the development standards for a 38-storey hotel building (as approved under Site Specific Zoning By-law 300-2023) by increasing the non-residential gross floor area, building height, and mechanical penthouse height. The new…File A0616/24TEY · submitted Jul 9, 2024 - 2874 Yonge St · 188 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Nov 22, 2023.
To alter the redevelopment plan for a mixed-use building approved under Site Specific By-law 697-2021(OLT) by permitting an increase in the building height, an increase in the total gross floor area, and the elimination of visitor parking…File A0612/23TEY · submitted Jul 10, 2023 - 350 Park Rd · 196 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development…File 25 209063 STE 11 OZ · submitted Aug 12, 2025 · City record - 440 Park Rd · 208 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development…File 25 209063 STE 11 OZ · submitted Aug 12, 2025 · City record - 538 Park Rd · 228 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development…File 25 209063 STE 11 OZ · submitted Aug 12, 2025 · City record
39 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 66 Collier St
Is 66 Collier St in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
Does 66 Collier St have open fire code violations?
No. The City's fire inspection records show no violations in open inspections. Source: Residential Fire Inspection Results.
What is being built near 66 Collier St?
There are 5 active planning applications within 250 metres (three under appeal, two approved). The closest is at 820 Church St, 84 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 66 Collier St been renovated?
Yes. The City has 24 building permits on record, 13 in the last 5 years. Source: Building Permits.
Is 66 Collier St a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 66 Collier St?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location