67 Cartwright Ave is in Yorkdale-Glen Park. It's outside TRCA flood hazard areas and there are 4 planning applications nearby (two waiting for a hearing date, one approved, one hearing on Nov 12).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 4 planning applications within 250 m: two waiting for a hearing date, one approved, one hearing on Nov 12.
03The building
0 building permits in the last 5 years. Together they added 2 new homes. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 2 projects from 5 permits
- Interior Alterations · completed Aug 19, 2021
Interior alterations to create a additional unit on second floor and add new door on ground floor to existing two unit dwelling · Permit 20 206969 - Deck or porch and interior renovation · completed Jul 7, 2020
Proposal for interior alterations, 2nd suite in the basement, remove and rebuild existing enclosed side entry porch with 2nd floor balcony above · 4 permits in this project (such as building, plumbing and heating) · Permit 19 203604
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M6A, 0 of 54 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6A is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 0 samples here (0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
4 active planning applications within 250 m (about a 3-minute walk): two waiting for a hearing date, one approved, one hearing on Nov 12. That's about typical for Toronto (the typical address has 1).
- 144 Cartwright Ave · 141 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The City has received it. A hearing date hasn't been set yet.
To obtain consent to sever a portion of land for the purpose of a lot addition.File B0076/16NY · submitted Oct 28, 2016 - 242 Cartwright Ave · 166 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The City has received it. A hearing date hasn't been set yet.
To obtain consent to sever a portion of land for the purpose of a lot addition.File B0075/16NY · submitted Oct 28, 2016 - 3130-150 Bridgeland Ave · 171 m awaySite Plan: City review of the design and layout of a new building
City planners approved the site plan, with conditions to meet before a building permit.
Site Plan Control application for two 2-storey automotive dealership buildings and a 4-storey above-grade parking structure. The proposed development comprises a total non-residential gross floor area of 7,585 square metres, which results…File 23 168385 NNY 08 SA · submitted Jun 30, 2023 · City record - 445 Mcadam Ave · 232 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
A public hearing is set for Nov 12, 2026 at 10:00 a.m.. Neighbours can send comments or speak at the hearing.
To convert the existing garage into a two (2) storey Garden Suite.File A0335/26NY · submitted Sep 24, 2026
3 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: garbage, green bin and yard waste. November 20: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 67 Cartwright Ave
Is 67 Cartwright Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 67 Cartwright Ave?
There are 4 active planning applications within 250 metres (two waiting for a hearing date, one approved, one hearing on Nov 12). The closest is at 44 Cartwright Ave, 141 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 67 Cartwright Ave been renovated?
Yes. The City has 5 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 67 Cartwright Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 67 Cartwright Ave?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 13, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location