Skip to content
My Address in Toronto
Address report

680 Sheppard Ave E

An address in Bayview Village, outside TRCA flood and shoreline hazard areas, with 15 active development applications within 250 metres.

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • No fire code violations in open inspections.
  • Outside TRCA flood and shoreline hazard areas.
  • 15 active development applications and 1 Committee of Adjustment application within 250 m.
RentSafe score—not a registered apartment building
Fire code violations0in open inspections
Applications16active within 250 m
Flood hazardOutsideTRCA mapping
Whittaker CresCaracas RdBessarion RdBurbank DrDervock CresGreenbriar RdHawksbury DrRed Maple CrtElkhorn DrSheppard Ave E123456789101112Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo violations in open inspectionsThis addressResidential Fire Inspection Results · last opened Nov 21, 2025
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years1 permitThis addressBuilding Permits · 2 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (2)
  • Demolition · Closed · Oct 27, 2025
    Proposal to demolish the existing 3 storey brick apartment building, and 2 concrete block and brick garages for the purpose of redeveloping the land.See also 21 232444 NNY17 SB. · Permit 25 137772 DEM
  • Interior Alterations · Closed - Dormant · Sep 24, 1997
    RETROFIT · Permit 97 251204 BLD

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA55Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M2K0 of 17 above 0.01 ppmYour area · M2KNon Regulated Lead Sample · May 27, 2014 to Sep 11, 2025

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    688 Sheppard Ave E · 210 m · Site Plan · Appeal Received
    Site Plan application for the proposal of a 22 storey residential building with a 8 -13 storey mid-rise component and a 6-8 storey podium along Sheppard Avenue East containing 487 residential units, including 35 rental replacement units.…
    File 20 110316 NNY 17 SA · submitted Jan 30, 2020 · City record
  2. 2
    688 Sheppard Ave E · 210 m · Official Plan / Rezoning · Under Review
    OPA & Rezoning Application proposes the development of two towers at 37 and 28 storeys on a shared six-storey podium with a total of 789 residential units, inclusive of 47 rental replacement units. A total of approximately 70 square…
    File 26 156705 NNY 17 OZ · submitted May 7, 2026 · City record
  3. 3
    680 Sheppard Ave E · 222 m · Site Plan · Appeal Received
    Site Plan application for the proposal of a 22 storey residential building with a 8 -13 storey mid-rise component and a 6-8 storey podium along Sheppard Avenue East containing 487 residential units, including 35 rental replacement units.…
    File 20 110316 NNY 17 SA · submitted Jan 30, 2020 · City record
  4. 4
    680 Sheppard Ave E · 222 m · Official Plan / Rezoning · Under Review
    OPA & Rezoning Application proposes the development of two towers at 37 and 28 storeys on a shared six-storey podium with a total of 789 residential units, inclusive of 47 rental replacement units. A total of approximately 70 square…
    File 26 156705 NNY 17 OZ · submitted May 7, 2026 · City record
  5. 5
    698 Sheppard Ave E · 230 m · Official Plan / Rezoning · OMB Approved
    The revised proposal is to construct a 32-storey and 28-storey mixed use buildings (705 units) with a shared 8-storey podium and 4-storey streetwall. The total gross floor area is 54,512 sq.m. (7.25 FSI). The residential gross floor area…
    File 22 217053 NNY 17 OZ · submitted Oct 14, 2022 · City record
  6. 6
    690 Sheppard Ave E · 232 m · Official Plan / Rezoning · OMB Approved
    The revised proposal is to construct a 32-storey and 28-storey mixed use buildings (705 units) with a shared 8-storey podium and 4-storey streetwall. The total gross floor area is 54,512 sq.m. (7.25 FSI). The residential gross floor area…
    File 22 217053 NNY 17 OZ · submitted Oct 14, 2022 · City record
  7. 7
    696 Sheppard Ave E · 233 m · Official Plan / Rezoning · OMB Approved
    The revised proposal is to construct a 32-storey and 28-storey mixed use buildings (705 units) with a shared 8-storey podium and 4-storey streetwall. The total gross floor area is 54,512 sq.m. (7.25 FSI). The residential gross floor area…
    File 22 217053 NNY 17 OZ · submitted Oct 14, 2022 · City record
  8. 8
    702 Sheppard Ave E · 233 m · Official Plan / Rezoning · OMB Approved
    The revised proposal is to construct a 32-storey and 28-storey mixed use buildings (705 units) with a shared 8-storey podium and 4-storey streetwall. The total gross floor area is 54,512 sq.m. (7.25 FSI). The residential gross floor area…
    File 22 217053 NNY 17 OZ · submitted Oct 14, 2022 · City record
  9. 9
    692 Sheppard Ave E · 234 m · Official Plan / Rezoning · OMB Approved
    The revised proposal is to construct a 32-storey and 28-storey mixed use buildings (705 units) with a shared 8-storey podium and 4-storey streetwall. The total gross floor area is 54,512 sq.m. (7.25 FSI). The residential gross floor area…
    File 22 217053 NNY 17 OZ · submitted Oct 14, 2022 · City record
  10. 10
    700 Sheppard Ave E · 234 m · Official Plan / Rezoning · OMB Approved
    The revised proposal is to construct a 32-storey and 28-storey mixed use buildings (705 units) with a shared 8-storey podium and 4-storey streetwall. The total gross floor area is 54,512 sq.m. (7.25 FSI). The residential gross floor area…
    File 22 217053 NNY 17 OZ · submitted Oct 14, 2022 · City record
  11. 11
    706 Sheppard Ave E · 236 m · Official Plan / Rezoning · OMB Approved
    The revised proposal is to construct a 32-storey and 28-storey mixed use buildings (705 units) with a shared 8-storey podium and 4-storey streetwall. The total gross floor area is 54,512 sq.m. (7.25 FSI). The residential gross floor area…
    File 22 217053 NNY 17 OZ · submitted Oct 14, 2022 · City record
  12. 12
    704 Sheppard Ave E · 237 m · Official Plan / Rezoning · OMB Approved
    The revised proposal is to construct a 32-storey and 28-storey mixed use buildings (705 units) with a shared 8-storey podium and 4-storey streetwall. The total gross floor area is 54,512 sq.m. (7.25 FSI). The residential gross floor area…
    File 22 217053 NNY 17 OZ · submitted Oct 14, 2022 · City record

Development Applications; Committee of Adjustment Applications · 3 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 13, 2026This addressCollection calendar Friday 2
Next recyclingNovember 20, 2026This addressSolid Waste Collection Schedule
City councillorShelley CarrollWard 17councillor_carroll@toronto.ca · 416-338-2650

05Quick answers about 680 Sheppard Ave E

Is 680 Sheppard Ave E in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

Does 680 Sheppard Ave E have open fire code violations?

No. The City's fire inspection records show no violations in open inspections. Source: Residential Fire Inspection Results.

What is being built near 680 Sheppard Ave E?

15 active development applications within 250 metres, the closest at 688 Sheppard Ave E (210 m). Source: Development Applications.

When is garbage day at 680 Sheppard Ave E?

Collection calendar Friday 2. Next garbage pickup: Nov 13, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

680 Sheppard Ave E, Toronto — address report · My Address in Toronto