Skip to content
My Address in Toronto
Address report

7 Windrush Trl

An address in Highland Creek, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.

Data as of Nov 7, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood and shoreline hazard areas.
  • 0 active development applications and 1 Committee of Adjustment application within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications1active within 250 m
Flood hazardOutsideTRCA mapping
Wishaw RdMilroy CresGlenthorne DrWindrush TrlPlant BlvdMorrish RdSugarbush SqWalding GtBobmar RdGladys RdRitz Garden CrtWatson StCalthorpe AveEllesmere Rd1Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone open (1 closed)This addressBuilding Construction/Demolition Violations
Building permits, last 5 years4 permitsThis addressBuilding Permits · 4 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (4)
  • Second Suite (New) · Revision Issued · Jun 13, 2024
    REVISION 01 REVISION OF PERMIT #24-109331 BLD 00 SRPROPOSED A NEW CEILING ASSEMBLY IN THE BASEMENT BECAUSEOWNER NEEDS MORE FIRE RESISTANCE. Convert the basement to a second dwelling unit, three… · Permit 24 109331 BLD
  • Building Permit Related (DR) · Inspection · Feb 5, 2024
    Drain - Convert the basement to a second dwelling unit, three enlarged existing windows including the egress window and below grade entrance to the basement in the rear yard · Permit 24 109331 DRN
  • Second Suite (New) · Inspection · Feb 5, 2024
    Convert the basement to a second dwelling unit, three enlarged existing windows including the egress window and below grade entrance to the basement in the rear yard · Permit 24 109331 BLD
  • Building Permit Related(PS) · Inspection · Feb 5, 2024
    Plumbing - Convert the basement to a second dwelling unit, three enlarged existing windows including the egress window and below grade entrance to the basement in the rear yard · Permit 24 109331 PLB

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA59Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M1C1 of 17 above 0.01 ppmYour area · M1CNon Regulated Lead Sample · May 29, 2014 to May 5, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    84 Bobmar Rd · 234 m · Committee of Adjustment · Consent (severance) · Postponed
    File B0015/26SC · submitted Jul 21, 2026

Development Applications; Committee of Adjustment Applications · 4 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 17, 2026This addressCollection calendar Tuesday 1
Next recyclingNovember 10, 2026This addressSolid Waste Collection Schedule
City councillorNeethan ShanWard 25Councillor_Shan@toronto.ca · 416-338-3771

05Quick answers about 7 Windrush Trl

Is 7 Windrush Trl in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 7 Windrush Trl?

0 active development applications within 250 metres. Source: Development Applications.

When is garbage day at 7 Windrush Trl?

Collection calendar Tuesday 1. Next garbage pickup: Nov 17, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

7 Windrush Trl, Toronto — address report · My Address in Toronto