71 First Ave
An address in South Riverdale, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
01The building
Recent permits (5)
- Building Permit Related(MS) · Closed · Aug 16, 2022
HVAC - Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, interior alterations, underpinning, a basement walkout, a rear… · Permit 21 246845 HVA - Multiple Projects · Revision Issued · Jun 23, 2022
Rev 01: changes to proposed foundation. Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, interior alterations,… · Permit 21 246845 BLD - Multiple Projects · Inspection · Jan 20, 2022
Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, interior alterations, underpinning, a basement walkout, a rear deck,… · Permit 21 246845 BLD - Building Permit Related(PS) · Closed · Jan 20, 2022
Plumbing - Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, interior alterations, underpinning, a basement walkout, a… · Permit 21 246845 PLB - Building Permit Related (DR) · Closed · Jan 20, 2022
Drain - Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, interior alterations, underpinning, a basement walkout, a rear… · Permit 21 246845 DRN
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
No active development or Committee of Adjustment applications within 250 metres.
Development Applications; Committee of Adjustment Applications · 15 registered short-term rentals within 250 m.
04City services
05Quick answers about 71 First Ave
Is 71 First Ave in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 71 First Ave?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 71 First Ave?
Collection calendar Thursday 1. Next garbage pickup: Nov 19, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location