73 Lanark Ave
73 Lanark Ave is in Oakwood Village. It added a second suite (such as a basement apartment) in 2025, it's outside TRCA flood hazard areas and there are 14 planning applications nearby (five waiting for a hearing date, three under appeal, three under review, three others).
Data as of Nov 8, 2026 · Every item lists its source
- Added a second suite (such as a basement apartment) (permit issued 2025).
- Outside TRCA flood hazard areas.
- 14 planning applications within 250 m: five waiting for a hearing date, three under appeal, three under review, three others.
- Lead in tap-water samples is higher than average in postal area M6E.
03The building
4 building permits in the last 5 years, for 2 projects. This includes a second suite (such as a basement apartment), permitted 2025. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 2 projects from 7 permits
- Second suite (such as a basement apartment)New home · inspection · issued Aug 20, 2025
Proposal for interior alterations to convert to 2 Unit-Detached. · 4 permits in this project (such as building, plumbing and heating) · Permit 25 209044 - Interior Alterations · completed Jul 29, 2025
Proposal for interior alterations to convert to 2 Unit-Detached. · 3 permits in this project (such as building, plumbing and heating) · Permit 25 196002
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M6E, 15 of 434 home tap-water samples (3.5%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6E is higher than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 47 samples here (11%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
14 active planning applications within 250 m (about a 3-minute walk): five waiting for a hearing date, three under appeal, three under review, three others. That's more than at 9 in 10 Toronto addresses.
- 1593 Oakwood Ave · 137 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on Apr 6, 2017. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
To permit the construction of a new three-storey mixed use building.File A0076/17NY · submitted Jan 27, 2017 - 2605 Oakwood Ave · 156 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposed 5 storey mixed use building with 30 residential apartment units and ground floor retail. 12 stacked parking spaces would be located at the rear of the building, with access from adjacent laneway. Rear landscape open space and…File 17 278485 NNY 15 OZ · submitted Dec 21, 2017 · City record - 3605 Oakwood Ave · 156 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
INACTIVE Proposed 4 storey mixed use building with 30 residential apartment units and ground floor retail. 12 stacked parking spaces would be located at the rear of the building, with access from adjacent laneway. Rear landscape open…File 17 278488 NNY 15 SA · submitted Dec 21, 2017 · City record - 4603 Oakwood Ave · 160 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
INACTIVE Proposed 4 storey mixed use building with 30 residential apartment units and ground floor retail. 12 stacked parking spaces would be located at the rear of the building, with access from adjacent laneway. Rear landscape open…File 17 278488 NNY 15 SA · submitted Dec 21, 2017 · City record - 5603 Oakwood Ave · 160 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposed 5 storey mixed use building with 30 residential apartment units and ground floor retail. 12 stacked parking spaces would be located at the rear of the building, with access from adjacent laneway. Rear landscape open space and…File 17 278485 NNY 15 OZ · submitted Dec 21, 2017 · City record - 6601 Oakwood Ave · 165 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposed 5 storey mixed use building with 30 residential apartment units and ground floor retail. 12 stacked parking spaces would be located at the rear of the building, with access from adjacent laneway. Rear landscape open space and…File 17 278485 NNY 15 OZ · submitted Dec 21, 2017 · City record - 7601 Oakwood Ave · 165 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
INACTIVE Proposed 4 storey mixed use building with 30 residential apartment units and ground floor retail. 12 stacked parking spaces would be located at the rear of the building, with access from adjacent laneway. Rear landscape open…File 17 278488 NNY 15 SA · submitted Dec 21, 2017 · City record - 8101 Livingstone Ave · 185 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Oct 15, 2026. It has been appealed to the Toronto Local Appeal Body (TLAB), which will hold its own hearing and make the final decision.
To construct a three-storey detached fourplex in conjunction with a two-storey laneway suite at the rear of the property.File A0314/26NY · submitted Sep 2, 2026 - 939 Lanark Ave · 225 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
A public hearing is set for Nov 25, 2026 at 3:00 p.m.. Neighbours can send comments or speak at the hearing.
To construct a new three-storey detached dwelling (houseplex) with a front basement walkout, front balconies on the second and third storeys, a rear second storey balcony, and front and rear porches. The second storey of this building…File A0715/26TEY · submitted Oct 5, 2026 - 1094 Livingstone Ave · 235 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The City has received it. A hearing date hasn't been set yet.
File · submitted Nov 5, 2026 - 11729 Vaughan Rd · 248 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The City has received it. A hearing date hasn't been set yet.
File A0777/26TEY · submitted Oct 30, 2026 - 12729 Vaughan Rd · 248 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The City has received it. A hearing date hasn't been set yet.
File A0778/26TEY · submitted Oct 30, 2026
5 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 12: garbage, green bin and yard waste. November 19: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 73 Lanark Ave
Is 73 Lanark Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 73 Lanark Ave?
There are 14 active planning applications within 250 metres (five waiting for a hearing date, three under appeal, three under review, three others). The closest is at 593 Oakwood Ave, 137 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 73 Lanark Ave been renovated?
Yes. The City has 7 building permits on record, 4 in the last 5 years. They include a second suite (such as a basement apartment). Source: Building Permits.
Is 73 Lanark Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 73 Lanark Ave?
Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 12, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location