74 Resurrection Rd
74 Resurrection Rd is in Etobicoke City Centre. It's outside TRCA flood hazard areas and there is 1 planning application nearby (hearing on Dec 3).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 1 planning application within 250 m: hearing on Dec 3.
- Lead in tap-water samples is higher than average in postal area M9A.
03The building
0 building permits in the last 5 years. Together they added 5 new homes. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 3 permits
- New Building · inspection · issued Aug 8, 2002
Construction of townhouse Units 45-49 BLK H · 3 permits in this project (such as building, plumbing and heating) · Permit 02 112941
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M9A, 4 of 107 home tap-water samples (3.7%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M9A is higher than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 4 samples here (3.7%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
1 active planning application within 250 m (about a 3-minute walk): hearing on Dec 3. That's about typical for Toronto (the typical address has 1).
- 15134 Dundas St W · 170 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
A public hearing is set for Dec 3, 2026 at 9:30 a.m.. Neighbours can send comments or speak at the hearing.
To construct a 6-storey mixed-use building containing 25 dwelling units.File A0333/26EYK · submitted Oct 30, 2026
2 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: garbage, green bin and yard waste. November 18: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 74 Resurrection Rd
Is 74 Resurrection Rd in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 74 Resurrection Rd?
There is 1 active planning application within 250 metres (hearing on Dec 3). The closest is at 5134 Dundas St W, 170 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 74 Resurrection Rd been renovated?
Yes. The City has 3 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 74 Resurrection Rd a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 74 Resurrection Rd?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 11, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location