Skip to content
My Address in Toronto
Address report

747 Kipling Ave

An address in Etobicoke City Centre, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.

Data as of Nov 7, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood and shoreline hazard areas.
  • 0 active development applications and 1 Committee of Adjustment application within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications1active within 250 m
Flood hazardOutsideTRCA mapping
Goodrich RdJutland RdTitan RdTrueman AveKipling Ave1Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone open (1 closed)This addressBuilding Construction/Demolition Violations
Building permits, last 5 years3 permitsThis addressBuilding Permits · 4 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (4)
  • Building Permit Related(MS) · Permit Issued · Nov 25, 2024
    HVAC - Proposal to reduce the existing showroom area, rework the existing washrooms to include a universal washroom, a women's washroom and multi-stall men's washroom. Create 7 offices, a parts room… · Permit 24 164811 HVA
  • Interior Alterations · Permit Issued · Nov 25, 2024
    Proposal to reduce the existing showroom area, rework the existing washrooms to include a universal washroom, a women's washroom and multi-stall men's washroom. Create 7 offices, a parts room and a… · Permit 24 164811 BLD
  • Building Permit Related(PS) · Permit Issued · Nov 25, 2024
    Plumbing - Proposal to reduce the existing showroom area, rework the existing washrooms to include a universal washroom, a women's washroom and multi-stall men's washroom. Create 7 offices, a parts… · Permit 24 164811 PLB
  • Multiple Projects · Inspection · Jun 8, 2001
    Interior alterations for new washrooms, demolish wooden mezzanine and partition walls, new overhead door and alter existing 5 overhead doors. HVAC & Plumbing included. · Permit 01 131092 CMB

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA54Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M8Z0 of 63 above 0.01 ppmYour area · M8ZNon Regulated Lead Sample · Jan 21, 2014 to Mar 23, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    21 Jutland Rd · 227 m · Committee of Adjustment · Minor variance · TLAB Appeal
    To legalize and maintain a one-storey addition (walk-in cooler) between the two existing industrial buildings, a one-storey south side addition and a new loading space.
    File A0164/20EYK · submitted Apr 20, 2020

Development Applications; Committee of Adjustment Applications · 0 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 11, 2026This addressCollection calendar Wednesday 2
Next recyclingNovember 18, 2026This addressSolid Waste Collection Schedule
City councillorAmber MorleyWard 3Councillor_Morley@toronto.ca · 416-397-9273

05Quick answers about 747 Kipling Ave

Is 747 Kipling Ave in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 747 Kipling Ave?

0 active development applications within 250 metres. Source: Development Applications.

When is garbage day at 747 Kipling Ave?

Collection calendar Wednesday 2. Next garbage pickup: Nov 11, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

747 Kipling Ave, Toronto — address report · My Address in Toronto