75 Augusta Sq is in Kensington-Chinatown. It's outside TRCA flood hazard areas and there are 5 planning applications nearby (three approved, one waiting for a hearing date, one under appeal after a refusal).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 5 planning applications within 250 m: three approved, one waiting for a hearing date, one under appeal after a refusal.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 2 projects from 2 permits
- Sign Building Permit Related · completed Apr 15, 2019
To erect and display one ground sign.**Toronto Community Housing Corporation · Permit 16 226447 - Sign Building Permit Related · completed Apr 13, 2018
Proposal to erect and display two wall signs and one ground sign, all non-illuminated and displaying static copy. The two proposed wall signs are to be erected on the first storey and are to measure… · Permit 16 102345
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M5T, 0 of 85 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5T is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 1 samples here (1.2%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
5 active planning applications within 250 m (about a 3-minute walk): three approved, one waiting for a hearing date, one under appeal after a refusal. That's more than at most Toronto addresses (the typical address has 1).
- 1571 Dundas St W · 30 m awaySubdivision: a request to divide land into new lots and streets
It has been approved.
Draft Plan of Subdivision to update the Master Plan approved in 2011.File 17 278607 STE 20 SB · submitted Dec 22, 2017 · City record - 291 Augusta Ave · 178 m awaySubdivision: a request to divide land into new lots and streets
It has been approved.
Draft Plan of Subdivision to update the Master Plan approved in 2011.File 17 278607 STE 20 SB · submitted Dec 22, 2017 · City record - 3115 Denison Ave · 223 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To permit and maintain the conversion of four existing three-bedroom townhouse dwelling units into two-bedroom dwelling units by removing one bedroom from the ground floor of each unit, and the conversion of one existing two-bedroom…File A0733/26TEY · submitted Oct 13, 2026 - 442 Carr St · 231 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Nov 4, 2026.
To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered…File A0667/26TEY · submitted Sep 8, 2026 - 5184 Spadina Ave · 244 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on Dec 3, 2025. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
To alter the development standards (as approved under Site Specific Zoning By-law 762-2023) for a new 14 and 15-storey hotel building (east tower fronting Spadina Avenue, and west tower fronting Cameron Street), connected by a one-storey…File A0646/25TEY · submitted Aug 25, 2025
22 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 75 Augusta Sq
Is 75 Augusta Sq in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 75 Augusta Sq?
There are 5 active planning applications within 250 metres (three approved, one waiting for a hearing date, one under appeal after a refusal). The closest is at 571 Dundas St W, 30 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 75 Augusta Sq been renovated?
Yes. The City has 2 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 75 Augusta Sq a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 75 Augusta Sq?
Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location