75 Cheritan Ave

75 Cheritan Ave is in Lawrence Park South. It's outside TRCA flood hazard areas and there are 4 planning applications nearby (two approved, one under appeal after a refusal, one under appeal after approval).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 4 planning applications within 250 m: two approved, one under appeal after a refusal, one under appeal after approval.
Building permits0in the last 5 years
Applications nearby4active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 12garbage, green bin and yard waste
Yonge StDuplex AveLawrence AveChatsworth DrCheritan AveChudleigh AveGreer RdCortland Ave1234Map data: City of Toronto (Toronto Centreline)Duplex AveLawrence AveGreer RdCheritan AveChudleigh AveChatsworth Dr1234Map data: City of Toronto (Toronto Centreline)
The red dot is 75 Cheritan Ave. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 3 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 1 project from 3 permits
  • Addition(s) · completed Apr 16, 2026
    Revise - New two storey rear side addition with basement. See C of A. · 3 permits in this project (such as building, plumbing and heating) · Permit 04 160390

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M4R2.1% of tests above Ontario's limitYour area · M4RNon Regulated Lead Sample · 195 tests, Jan 16, 2014 to Sep 14, 2026

In postal area M4R, 4 of 195 home tap-water samples (2.1%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4R is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 11 samples here (5.6%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

4 active planning applications within 250 m (about a 3-minute walk): two approved, one under appeal after a refusal, one under appeal after approval. That's about typical for Toronto (the typical address has 1).

  1. 1
    77 Cheritan Ave · 13 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Aug 9, 2018.

    To construct a new addition to the rear of the existing dwelling.
    File A0461/18NY · submitted Jun 20, 2018
  2. 2
    58 Cheritan Ave · 112 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on May 26, 2016. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    To construct a new two-storey dwelling. The existing dwelling would be demolished.
    File A0335/16NY · submitted Apr 11, 2016
  3. 3
    77 Chatsworth Dr · 123 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Sep 22, 2016. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    To construct a new two-storey dwelling. The existing dwelling would be demolished. Please note this application was DEFERRED Thursday, August 25, 2016 at the request of the applicant to revise their application. Further to the previous…
    File A0615/16NY · submitted Jul 4, 2016
  4. 4
    39 Chudleigh Ave · 203 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Aug 10, 2023.

    Proposal to construct new two storey dwelling with a rear deck, rear walkout, covered porch and window projection on the east wall.
    File A0340/23NY · submitted Jun 13, 2023
Short-term rentals nearby2 registered homesWithin 250 mShort Term Rentals Registration

2 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingThursdaysThis addressSolid Waste Collection Schedule

Next: November 12: garbage, green bin and yard waste. November 19: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorMike ColleWard 8councillor_colle8@toronto.ca · 416-338-2500

05Quick answers about 75 Cheritan Ave

Is 75 Cheritan Ave in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 75 Cheritan Ave?

There are 4 active planning applications within 250 metres (two approved, one under appeal after a refusal, one under appeal after approval). The closest is at 77 Cheritan Ave, 13 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 75 Cheritan Ave been renovated?

Yes. The City has 3 building permits on record, 0 in the last 5 years. Source: Building Permits.

Is 75 Cheritan Ave a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 75 Cheritan Ave?

Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 12, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Lawrence Park Ravine looking south from Chatsworth Drive toward Duplex Avenue
1950 · 165 m awayLawrence Park Ravine looking south from Chatsworth Drive toward Duplex AvenueCity of Toronto Archives, Fonds 200, Series 372, Subseries 58, Item 2039

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

75 Cheritan Ave, Toronto M4R: permits, flood risk and what's planned nearby · My Address in Toronto