75 Evans Ave
An address in Runnymede-Bloor West Village, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
- 0 active development applications and 8 Committee of Adjustment applications within 250 m.
01The building
Recent permits (8)
- Building Permit Related(PS) · Closed · Aug 10, 2022
Plumbing - Proposed basement underpinning and interior alterations. · Permit 22 185258 PLB - Multiple Projects · Closed · Aug 10, 2022
Proposed basement underpinning and interior alterations. · Permit 22 185258 BLD - Building Permit Related (DR) · Closed · Aug 10, 2022
Drain - Proposed basement underpinning and interior alterations. · Permit 22 185258 DRN - Building Permit Related(MS) · Revocation Pending · Dec 23, 2020
HVAC - Proposed two storey rear addition to the existing single family dwelling. · Permit 20 213340 HVA - Building Permit Related(PS) · Revocation Pending · Dec 9, 2020
Plumbing - Proposed two storey rear addition to the existing single family dwelling. · Permit 20 213340 PLB - Addition(s) · Permit Issued · Dec 9, 2020
Proposed two storey rear addition to the existing single family dwelling. · Permit 20 213340 BLD - Building Permit Related(PS) · Inspection · Jun 14, 2013
Plumbing - Interior alterations to existing 2 storey sfd-detached · Permit 13 187375 PLB - Interior Alterations · Inspection · Jun 14, 2013
Interior alterations to existing 2 storey sfd-detached · Permit 13 187375 BLD
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
- 183 Evans Ave · 31 m · Committee of Adjustment · Minor variance · AcceptedTo construct a new semi-detached fourplex and a semi-detached garden suite in the rear yard.File A0241/26EYK · submitted Jul 20, 2026
- 283 Evans Ave · 31 m · Committee of Adjustment · Consent (severance) · AcceptedTo obtain consent to sever the lot into two undersized residential lots.File B0028/26EYK · submitted Jul 20, 2026
- 383 Evans Ave · 31 m · Committee of Adjustment · Minor variance · AcceptedTo construct a new semi-detached fourplex and a semi-detached garden suite in the rear yard.File A0240/26EYK · submitted Jul 20, 2026
- 4462 Willard Ave · 101 m · Committee of Adjustment · Minor variance · ApprovedTo alter the existing two-storey detached dwelling by constructing a rear two-storey addition with basement extension below and new stairs to grade. Also, to enclose a portion of the front porch (north side) for a new foyer and relocate…File A0652/25TEY · submitted Aug 25, 2025
- 5111 Evans Ave · 119 m · Committee of Adjustment · Consent (severance) · Conditional ConsentTo obtain consent to sever the lot into two undersized residential lots.File B0053/23EYK · submitted Nov 24, 2023
- 6470 Willard Ave · 129 m · Committee of Adjustment · Minor variance · Hearing ScheduledTo alter the existing two-storey detached dwelling by partially enclosing the existing front porch, and to construct a new front covered porch with stairs. Also, to construct a rear two-storey addition (including a basement extension)…File A0695/26TEY · submitted Sep 25, 2026
- 7115 Evans Ave · 134 m · Committee of Adjustment · Consent (severance) · Conditional ConsentTo obtain consent to sever the property into two undersized residential lots.File B0046/17EYK · submitted Jun 1, 2017
- 8699 Annette St · 249 m · Committee of Adjustment · Minor variance · Approved with ConditionsTo alter the existing two-storey semi-detached dwelling by constructing a rear three-storey addition, a rear ground floor landing with stairs, and a rear third floor roof walkout deck. There will be a total of two dwelling units within…File A0945/23TEY · submitted Sep 7, 2023
Development Applications; Committee of Adjustment Applications · 4 registered short-term rentals within 250 m.
04City services
05Quick answers about 75 Evans Ave
Is 75 Evans Ave in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 75 Evans Ave?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 75 Evans Ave?
Collection calendar Wednesday 2. Next garbage pickup: Nov 11, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location