Skip to content
My Address in Toronto
Address report

75 Milner Ave

An address in Agincourt South-Malvern West, inside a TRCA flood or shoreline hazard area, with no active development applications within 250 metres.

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Inside a TRCA flood or shoreline hazard area.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications0active within 250 m
Flood hazardInsideTRCA mapping
Highway 401 C WHighway 401 X E401 X E 401 C EHighway 401 X WHighway 401 C EMilner AveMcCowan RdMap data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years6 permitsThis addressBuilding Permits · 15 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (8)
  • Other(BA) · Examiner's Notice Sent · Oct 7, 2025
    Proposal to install solar panels atop existing roof. · Permit 25 236549 BLD
  • Building Permit Related(PS) · Closed · Mar 18, 2024
    Plumbing Revision 02 - Proposal to add one Grease InterceptorPlumbing - One storey addition to the existing one storey warehouse · Permit 22 222718 PLB
  • Building Permit Related(PS) · Closed · Nov 8, 2023
    REVISION 01: ADDITIONAL FLOOR DRAINSPlumbing - One storey addition to the existing one storey warehouse · Permit 22 222718 PLB
  • Sprinklers · Permit Issued · Jul 18, 2023
    Design of fire sprinkler system for phase 2 building addition.Read in conjunction with permit 22 222718 BLD. · Permit 23 157575 FSU
  • Addition(s) · Closed · May 24, 2023
    One storey addition to the existing one storey warehouse · Permit 22 222718 BLD
  • Building Permit Related(MS) · Closed · May 24, 2023
    HVAC - One storey addition to the existing one storey warehouse · Permit 22 222718 HVA
  • Building Permit Related(PS) · Closed · May 24, 2023
    Plumbing - One storey addition to the existing one storey warehouse · Permit 22 222718 PLB
  • Building Permit Related(FS) · Application On Hold · Jan 12, 2023
    FS - Sprinkler Shop Drawing - One storey addition to the existing one storey warehouse · Permit 22 222718 FSU

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardInsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaInside — TRCA permit may be needed for workThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA60Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M1S1 of 29 above 0.01 ppmYour area · M1SNon Regulated Lead Sample · May 21, 2014 to Jul 24, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

No active development or Committee of Adjustment applications within 250 metres.

Development Applications; Committee of Adjustment Applications · 0 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 18, 2026This addressCollection calendar Wednesday 1
Next recyclingNovember 11, 2026This addressSolid Waste Collection Schedule
City councillorJamaal MyersWard 23Councillor_Myers@toronto.ca · 416-338-2858

05Quick answers about 75 Milner Ave

Is 75 Milner Ave in a flood plain?

Yes. It is inside a TRCA flood or shoreline hazard area. Source: TRCA Regulation mapping 2025.

What is being built near 75 Milner Ave?

0 active development applications within 250 metres. Source: Development Applications.

When is garbage day at 75 Milner Ave?

Collection calendar Wednesday 1. Next garbage pickup: Nov 18, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

75 Milner Ave, Toronto — address report · My Address in Toronto