75 Squires Ave
An address in O'Connor-Parkview, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
- 0 active development applications and 1 Committee of Adjustment application within 250 m.
01The building
Recent permits (7)
- Back Water Valve (Sewer only) · Closed · Mar 6, 2020
Installation of a back water valve to existing dwelling · Permit 20 123045 DRN - Building Permit Related(MS) · Closed · Apr 13, 2017
HVAC - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a new 2nd floor addition, a new attached garage with 2nd floor addition over the new… · Permit 15 261973 HVA - Building Permit Related(MS) · Closed · Jul 21, 2016
Rev01- new duct workHVAC - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a new 2nd floor addition, a new attached garage with 2nd floor… · Permit 15 261973 HVA - Multiple Projects · Closed · Mar 31, 2016
Revision - to the 2ND floor - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a new 2nd floor addition, a new attached garage with 2nd floor… · Permit 15 261973 BLD - Building Permit Related(MS) · Closed · Jan 14, 2016
HVAC - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a new 2nd floor addition, a new attached garage with 2nd floor addition over the new… · Permit 15 261973 HVA - Building Permit Related(PS) · Closed · Jan 14, 2016
Plumbing - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a new 2nd floor addition, a new attached garage with 2nd floor addition over the new… · Permit 15 261973 PLB - Multiple Projects · Closed · Jan 14, 2016
Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a new 2nd floor addition, a new attached garage with 2nd floor addition over the new garage and… · Permit 15 261973 BLD
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
- 18 Holmstead Ave · 149 m · Committee of Adjustment · Consent (severance) · Conditional ConsentTo obtain consent to sever the property into two undersized residential lots and to maintain existing easements/rights-of-way.File B0041/25TEY · submitted Jun 19, 2025
Development Applications; Committee of Adjustment Applications · 3 registered short-term rentals within 250 m.
04City services
05Quick answers about 75 Squires Ave
Is 75 Squires Ave in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 75 Squires Ave?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 75 Squires Ave?
Collection calendar Thursday 2. Next garbage pickup: Nov 12, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location