77 Bishop Ave
77 Bishop Ave is in Newtonbrook East. It's outside TRCA flood hazard areas and there are 3 planning applications nearby (two deferred, one waiting for a hearing date).
Data as of Nov 8, 2026 · Every item lists its source
- 6 building permits in the last 5 years.
- Outside TRCA flood hazard areas.
- 3 planning applications within 250 m: two deferred, one waiting for a hearing date.
03The building
6 building permits in the last 5 years, for 2 projects. Together they added 1 new home. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 2 projects from 7 permits
- New Building · completed Oct 5, 2023
Revision #01 - Added concrete topping for in-floor heat on all floorsProposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 23 141005… · 6 permits in this project (such as building, plumbing and heating) · Permit 23 141018 - Demolition · completed Oct 1, 2026
Proposal to demolish the existing 1 storey SFD-detached dwelling. · Permit 23 141005
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M2M, 0 of 50 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M2M is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 0 samples here (0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
3 active planning applications within 250 m (about a 3-minute walk): two deferred, one waiting for a hearing date. That's about typical for Toronto (the typical address has 1).
- 1111 Pemberton Ave · 173 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To construct a new dwelling. To construct a new dwelling. Please note File Numbers B0044/21NY, A0849/21NY, A0850/21NY will be considered jointly. Please note, this file was deferred on April 14th, 2022 in order to meet with City Planning.File A0850/21NY · submitted Dec 1, 2021 - 2111 Pemberton Ave · 173 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To construct a new dwelling. Please note File Numbers B0044/21NY, A0849/21NY, A0850/21NY will be considered jointly. Please note, this file was deferred on April 14th, 2022 in order to meet with City Planning.File A0849/21NY · submitted Dec 1, 2021 - 3111 Pemberton Ave · 173 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The hearing was postponed. A new date hasn't been published yet.
To obtain consent to sever the land for the purpose of creating two (2) undersized parcels. Please note, this file was deferred on April 14th, 2022 in order to meet with City Planning.File B0044/21NY · submitted Dec 1, 2021
3 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: garbage, green bin and yard waste. November 20: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 77 Bishop Ave
Is 77 Bishop Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 77 Bishop Ave?
There are 3 active planning applications within 250 metres (two deferred, one waiting for a hearing date). The closest is at 111 Pemberton Ave, 173 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 77 Bishop Ave been renovated?
Yes. The City has 7 building permits on record, 6 in the last 5 years. Source: Building Permits.
Is 77 Bishop Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 77 Bishop Ave?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 13, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location