Skip to content
My Address in Toronto
Address report

771 Yonge St

771 Yonge St is in Rosedale-Moore Park, on the City's Heritage Register. It's outside TRCA flood hazard areas and there are 17 planning applications nearby (14 approved, three under appeal).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • No fire code violations in open inspections.
  • 15 building permits in the last 5 years.
  • It is individually designated under the Ontario Heritage Act (Part IV).
  • Outside TRCA flood hazard areas.
  • 17 planning applications within 250 m: 14 approved, three under appeal.
Building permits15in the last 5 years
Applications nearby17active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 11recycling and green bin
Bay StBloor StChurch StPark RdDavenport RdYonge StYorkville AveScollard StBellair StCumberland StCollier StAsquith AveReynolds StSt Thomas StBalmuto StCharles StHayden St123456789101112Map data: City of Toronto (Toronto Centreline)Bloor StBay StRosedale Valley RdChurch StPark RdYonge StDavenport RdCumberland StCollier StAsquith AveScollard StBalmuto StHayden St123456789101112Map data: City of Toronto (Toronto Centreline)
The red dot is 771 Yonge St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Fire code inspectionsNo violations in open inspectionsThis addressResidential Fire Inspection Results · last opened Sep 3, 2026
Building orders and noticesNone open (1 closed)This addressBuilding Construction/Demolition Violations
Building permits, last 5 years15 permitsThis addressBuilding Permits · 26 on record

15 building permits in the last 5 years, for 5 projects. Together they added 202 new homes. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusPart IVThis addressHeritage Register

It is individually designated under the Ontario Heritage Act (Part IV). Changes to its heritage features need a heritage permit from the City.

Permit history: 9 projects from 25 permits (most recent 25 of 26)
  • Interior Alterations · inspection · issued May 21, 2025
    Interior alterations to retain heritage building - landlord improvements - see 21-173391 NB · 4 permits in this project (such as building, plumbing and heating) · Permit 24 212977
  • Sprinklers · permit issued · issued Apr 3, 2025
    Submission "revised" sprinkler shop drawings for floors 18-25 inclusiveof new building in permit 21-173391 BLD 00 NB . · Permit 25 138318
  • Alternative Solution · completed Apr 3, 2025
    Alternative solution for sprinkler­ protected window assemblies in 8 suites on Levels 18 to 25, located on the east exposing building face of the project located at 767-773 Yonge Street in the City… · Permit 25 138222
  • Alternative Solution · completed Mar 21, 2025
    The basement level in the 2-storey heritage component will be served by a single exit. · Permit 25 116513
  • Demolition · inspection · issued Nov 26, 2021
    Proposal to demolish the existing 2 storey commercial building at 767 Yonge Street and partial demolition of 771 Yonge Street (retention of existing heritage building). See also 19 265064 STE 11 SA. · Permit 21 219291
  • New Building · completed Sep 30, 2026
    front vestibule, alter unit 2402 and install one (1) additional rated door in stairwell vestibule of floor 19Proposal for a new 25 Storey mixed use Condominium with 3 level underground… · 14 permits in this project (such as building, plumbing and heating) · Permit 21 173391
  • Alternative Solution · completed Aug 31, 2021
    Proposal for all floors, to design a standpipe system in a manner that standpipe risers provided with hose connections will be located in exit stairs enclosures or in 1 H rated shafts, if required.… · Permit 21 182819
  • Sign Building Permit Related · completed Mar 5, 2018
    In conjunction with a multi-storey building on the premises, proposal to erect and display two wall signs, one of which is illuminated, both displaying static copy on the first storey west… · Permit 16 189527
  • Interior renovation · completed May 29, 2018
    Interior alterations to existing retail space to remove existing dry wall ceiling and replace with drop ceiling · Permit 05 142097

04Risks and the ground

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M4W1.2% of tests above Ontario's limitYour area · M4WNon Regulated Lead Sample · 82 tests, Apr 27, 2014 to Mar 17, 2026

In postal area M4W, 1 of 82 home tap-water samples (1.2%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4W is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (6.1%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

17 active planning applications within 250 m (about a 3-minute walk): 14 approved, three under appeal. That's more than at 9 in 10 Toronto addresses.

  1. 1
    878 Yonge St · 121 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    Site Plan Amendment to the previously approved 16 173156 STE 11 SA
    File 24 103640 STE 11 SA · submitted Jan 11, 2024 · City record
  2. 2
    3 Scollard St · 125 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    Site Plan Amendment to the previously approved 16 173156 STE 11 SA
    File 24 103640 STE 11 SA · submitted Jan 11, 2024 · City record
  3. 3
    876 Yonge St · 126 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    Site Plan Amendment to the previously approved 16 173156 STE 11 SA
    File 24 103640 STE 11 SA · submitted Jan 11, 2024 · City record
  4. 4
    874 Yonge St · 128 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    Site Plan Amendment to the previously approved 16 173156 STE 11 SA
    File 24 103640 STE 11 SA · submitted Jan 11, 2024 · City record
  5. 5
    820 Church St · 131 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Sep 18, 2024.

    To alter the development standards for a 38-storey hotel building (as approved under Site Specific Zoning By-law 300-2023) by increasing the non-residential gross floor area, building height, and mechanical penthouse height. The new…
    File A0616/24TEY · submitted Jul 9, 2024
  6. 6
    717 Church St · 135 m away
    Condominium: a request to divide a building into condominium units

    It has been approved.

    *** Draft Plan of Condominium for 300 residential dwelling units.There are concurrent rezoning and site plan control applications that are under review: 20 220898 STE 11 OZ and 21 194034 STE 11 SA
    File 21 215499 STE 11 CD · submitted Sep 21, 2021 · City record
  7. 7
    9 Scollard St · 146 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    Site Plan Amendment to the previously approved 16 173156 STE 11 SA
    File 24 103640 STE 11 SA · submitted Jan 11, 2024 · City record
  8. 8
    40 Park Rd · 146 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development…
    File 25 209063 STE 11 OZ · submitted Aug 12, 2025 · City record
  9. 9
    38 Park Rd · 151 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development…
    File 25 209063 STE 11 OZ · submitted Aug 12, 2025 · City record
  10. 10
    85 Collier St · 152 m away
    Condominium: a request to divide a building into condominium units

    It has been approved.

    *** Draft Plan of Condominium for 300 residential dwelling units.There are concurrent rezoning and site plan control applications that are under review: 20 220898 STE 11 OZ and 21 194034 STE 11 SA
    File 21 215499 STE 11 CD · submitted Sep 21, 2021 · City record
  11. 11
    11 Scollard St · 153 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    Site Plan Amendment to the previously approved 16 173156 STE 11 SA
    File 24 103640 STE 11 SA · submitted Jan 11, 2024 · City record
  12. 12
    89 Collier St · 156 m away
    Condominium: a request to divide a building into condominium units

    It has been approved.

    *** Draft Plan of Condominium for 300 residential dwelling units.There are concurrent rezoning and site plan control applications that are under review: 20 220898 STE 11 OZ and 21 194034 STE 11 SA
    File 21 215499 STE 11 CD · submitted Sep 21, 2021 · City record
Short-term rentals nearby50 registered homesWithin 250 mShort Term Rentals Registration

50 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingWednesdaysThis addressSolid Waste Collection Schedule

Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.

City councillorDianne SaxeWard 11Councillor_Saxe@toronto.ca · 416-392-4009

05Quick answers about 771 Yonge St

Is 771 Yonge St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

Does 771 Yonge St have open fire code violations?

No. The City's fire inspection records show no violations in open inspections. Source: Residential Fire Inspection Results.

What is being built near 771 Yonge St?

There are 17 active planning applications within 250 metres (14 approved, three under appeal). The closest is at 878 Yonge St, 121 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 771 Yonge St been renovated?

Yes. The City has 26 building permits on record, 15 in the last 5 years. Source: Building Permits.

Is 771 Yonge St a heritage property?

Yes. It is individually designated under the Ontario Heritage Act (Part IV). Changes to its heritage features need a heritage permit from the City. Source: Heritage Register.

When is garbage day at 771 Yonge St?

Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

View of west side of Yonge Street, view south to Cumberland Street
1973 · 20 m awayView of west side of Yonge Street, view south to Cumberland StreetCity of Toronto Archives, Fonds 1526, File 1, Item 143
Yonge Street looking north from north of Asquith Avenue (then called Jarvis Street).
1861 · 25 m awayYonge Street looking north from north of Asquith Avenue (then called Jarvis Street). Courtesy of Toronto Public Library
View of Ingles Hearing Aids on the west side of Yonge Street, at Yorkville Avenue
1973 · 93 m awayView of Ingles Hearing Aids on the west side of Yonge Street, at Yorkville AvenueCity of Toronto Archives, Fonds 1526, File 1, Item 142
View of Ingles Hearing Aids on the west side of Yonge Street, at Yorkville Avenue
1975 · 93 m awayView of Ingles Hearing Aids on the west side of Yonge Street, at Yorkville AvenueCity of Toronto Archives, Fonds 1526, File 1, Item 134
View of the west side of Yonge Street south of Yorkville
1975 · 93 m awayView of the west side of Yonge Street south of YorkvilleCity of Toronto Archives, Fonds 1526, File 1, Item 139
View of Yonge Street, south of Yorkville Street
1974 · 93 m awayView of Yonge Street, south of Yorkville StreetCity of Toronto Archives, Fonds 1526, File 1, Item 131
View of clothing window display on the west side of Yonge Street, south of Bloor Street
1975 · 108 m awayView of clothing window display on the west side of Yonge Street, south of Bloor StreetCity of Toronto Archives, Fonds 1526, File 2, Item 44
Yonge Street south from Bloor Street
1924 · 108 m awayYonge Street south from Bloor StreetCity of Toronto Archives, Fonds 1231, Item 2020
Red Lion Hotel, Yonge St., e. side, n. of Bloor St.; INTERIOR, assembly-room.
1912 · 108 m awayRed Lion Hotel, Yonge St., e. side, n. of Bloor St.; INTERIOR, assembly-room. Courtesy of Toronto Public Library

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

771 Yonge St, Toronto M4W: permits, flood risk and what's planned nearby · My Address in Toronto