Skip to content
My Address in Toronto
Address report

8 Dunkirk Rd

An address in Danforth East York, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.

Data as of Nov 7, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood and shoreline hazard areas.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications0active within 250 m
Flood hazardOutsideTRCA mapping
Glebemount AveKnight StBinswood AveSammon AveDunkirk RdBarker AveWoodmount AveFairside AveHolborne AveCrestland AveSouthridge AveFrater AveMemorial Park AveMortimer AveCoxwell AveMap data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 4 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (4)
  • Building Permit Related(MS) · Closed · Nov 27, 2017
    HVAC - Proposal to construct a new rear two-storey addition, new 2nd storey addition, conversion of the basement into a secondary suite, new front porch, new front 2nd floor balcony, rear ground… · Permit 16 271752 HVA
  • Building Permit Related(PS) · Closed · Oct 4, 2017
    Plumbing - Proposal to construct a new rear two-storey addition, new 2nd storey addition, conversion of the basement into a secondary suite, new front porch, new front 2nd floor balcony, rear ground… · Permit 16 271752 PLB
  • Building Permit Related (DR) · Closed · Oct 4, 2017
    Drain - Proposal to construct a new rear two-storey addition, new 2nd storey addition, conversion of the basement into a secondary suite, new front porch, new front 2nd floor balcony, rear ground… · Permit 16 271752 DRN
  • Addition(s) · Closed · Apr 3, 2017
    Proposal to construct a new rear two-storey addition, new 2nd storey addition, conversion of the basement into a secondary suite, new front porch, new front 2nd floor balcony, rear ground floor… · Permit 16 271752 BLD

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA46Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M4C21 of 726 above 0.01 ppmYour area · M4CNon Regulated Lead Sample · Jan 9, 2014 to Oct 21, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

No active development or Committee of Adjustment applications within 250 metres.

Development Applications; Committee of Adjustment Applications · 4 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 20, 2026This addressCollection calendar Friday 1
Next recyclingNovember 13, 2026This addressSolid Waste Collection Schedule
City councillorBrad BradfordWard 19councillor_bradford@toronto.ca · 416-338-2755

05Quick answers about 8 Dunkirk Rd

Is 8 Dunkirk Rd in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 8 Dunkirk Rd?

0 active development applications within 250 metres. Source: Development Applications.

When is garbage day at 8 Dunkirk Rd?

Collection calendar Friday 1. Next garbage pickup: Nov 20, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

8 Dunkirk Rd, Toronto — address report · My Address in Toronto