Skip to content
My Address in Toronto
Address report

80 Dundas St E

80 Dundas St E is in Downtown Yonge East, in a registered apartment building built in 1995 with 138 units. It's outside TRCA flood hazard areas and there are 15 planning applications nearby (six under review, six under appeal, three approved by the tribunal).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • This building scored 92 out of 100 when last evaluated (Oct 6, 2025). That's lower than 56% of evaluated buildings in Toronto.
  • 4 fire code violations in open inspections (most recent opened Jul 30, 2026).
  • Outside TRCA flood hazard areas.
  • 15 planning applications within 250 m: six under review, six under appeal, three approved by the tribunal.
RentSafe score92out of 100
Fire code violations4in open inspections
Applications nearby15active, within 250 m
Flood hazardOutsideTRCA mapping
Yonge StDundas StJarvis StShuter StChurch StElm StDundas SqGould StMutual StDalhousie StBond StVictoria StGeorge St123456789101112Map data: City of Toronto (Toronto Centreline)Yonge StDundas StShuter StChurch StDundas SqGould StMutual StDalhousie StBond StVictoria St123456789101112Map data: City of Toronto (Toronto Centreline)
The red dot is 80 Dundas St E. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

01The building

ItemFindingPrecisionSource
RentSafe evaluation92 / 100This addressApartment Building Evaluation · evaluated Oct 6, 2025

RentSafe is the City's inspection program for apartment buildings with 3+ storeys and 10+ units. This building scored 92 out of 100 when last evaluated (Oct 6, 2025). That's lower than 56% of evaluated buildings in Toronto.

Building15 storeys · 138 units · built 1995This addressApartment Building Evaluation
Fire code inspections4 violations in open inspectionsThis addressResidential Fire Inspection Results · last opened Jul 30, 2026
Building orders and noticesNone open (2 closed)This addressBuilding Construction/Demolition Violations
Building permits, last 5 years1 permitThis addressBuilding Permits · 8 on record

1 building permit in the last 5 years. Together they added 138 new homes. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Open fire code items (4)
  • Making of records · opened Apr 30, 2026
  • Exit signs · opened Apr 30, 2026
  • Damaged fire separations · opened Apr 30, 2026
  • Accumulation of combustible materials · opened Apr 30, 2026
Permit history: 7 projects from 8 permits
  • Building work · permit issued · issued Jun 29, 2022
    Installing new steel gates and fencing at rear (north side) of the property · Permit 22 144100
  • Fire Damage · completed Sep 20, 2019
    Proposal to remove and replace brick veneer and replace insulation due to fire damage · Permit 19 205844
  • Interior Alterations · completed Oct 31, 2020
    Permit for interior alterations to existing refuse room at basement level to enlarge Recycling Area with structural modifications. · Permit 15 120883
  • Fixtures/Roof Drains: Other · revision issued · issued Dec 11, 2014
    REVISION - as per drawings - adding 2 sinksTo install plumbing fixtures to the existing take out restaurant with no seating accomodations. NOTE: address has convenienc address of 86 & 88 Dundas St E. · 2 permits in this project (such as building, plumbing and heating) · Permit 14 256594
  • Backflow Prevention Devices (Water only) · completed Feb 13, 2026
    To install a back flow preventor to the existing multi-unit building. · Permit 14 148093
  • Garage Repair/Reconstruction · permit issued · issued Sep 10, 2013
    Proposal for parking garage repairs including localized concrete and membrane repairs throughout the ground floor, P1, P2 and P3 Levels. (250m2) · Permit 13 220140
  • Unknown · completed Sep 18, 2026
    Build mixed use 16 storey and 6 storey bldg. Containing retail stores, 138 dwelling units (social housing) and 3 levels of underground parking partly accessory to the bond place hotel at 65 dundas… · Permit 92 012399

02Risks and the ground

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M5B0% of tests above Ontario's limitYour area · M5BNon Regulated Lead Sample · 17 tests, Jun 6, 2014 to Jun 27, 2025

In postal area M5B, 0 of 17 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). That's too few samples to compare with the rest of the city. Health Canada recommends a stricter limit of 5 micrograms per litre: 1 samples here (5.9%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. Buildings with more than six units don't have lead service pipes.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

15 active planning applications within 250 m (about a 3-minute walk): six under review, six under appeal, three approved by the tribunal. That's more than at 9 in 10 Toronto addresses.

  1. 1
    50 Gerrard St E · 214 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that…
    File 22 227434 STE 13 SA · submitted Nov 8, 2022 · City record
  2. 2
    50 Gerrard St E · 214 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey…
    File 22 227435 STE 13 OZ · submitted Nov 8, 2022 · City record
  3. 3
    102 Gerrard St E · 227 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Proposal for a 10-storey building fronting onto Jarvis Street connected to a 25-storey tower fronting onto Mutual Street. A total of 256 residential units are proposed. There are existing heritage buildings on site that are proposed to be…
    File 16 271639 STE 27 OZ · submitted Dec 29, 2016 · City record
  4. 4
    104 Gerrard St E · 230 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Proposal for a 10-storey building fronting onto Jarvis Street connected to a 25-storey tower fronting onto Mutual Street. A total of 256 residential units are proposed. There are existing heritage buildings on site that are proposed to be…
    File 16 271639 STE 27 OZ · submitted Dec 29, 2016 · City record
  5. 5
    396 Church St · 235 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey…
    File 22 227435 STE 13 OZ · submitted Nov 8, 2022 · City record
  6. 6
    396 Church St · 235 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that…
    File 22 227434 STE 13 SA · submitted Nov 8, 2022 · City record
  7. 7
    398 Church St · 236 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that…
    File 22 227434 STE 13 SA · submitted Nov 8, 2022 · City record
  8. 8
    398 Church St · 236 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey…
    File 22 227435 STE 13 OZ · submitted Nov 8, 2022 · City record
  9. 9
    110 Gerrard St E · 240 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Proposal for a 10-storey building fronting onto Jarvis Street connected to a 25-storey tower fronting onto Mutual Street. A total of 256 residential units are proposed. There are existing heritage buildings on site that are proposed to be…
    File 16 271639 STE 27 OZ · submitted Dec 29, 2016 · City record
  10. 10
    77 Mcgill St · 245 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that…
    File 22 227434 STE 13 SA · submitted Nov 8, 2022 · City record
  11. 11
    77 Mcgill St · 245 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey…
    File 22 227435 STE 13 OZ · submitted Nov 8, 2022 · City record
  12. 12
    73 Mcgill St · 247 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that…
    File 22 227434 STE 13 SA · submitted Nov 8, 2022 · City record
Short-term rentals nearby75 registered homesWithin 250 mShort Term Rentals Registration

75 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

04City services

ItemFindingPrecisionSource
Garbage daySee calendarThis addressSolid Waste Collection Schedule
City councillorChris MoiseWard 13Councillor_Moise@toronto.ca · 416-392-7903

05Quick answers about 80 Dundas St E

Is 80 Dundas St E in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

Does 80 Dundas St E have open fire code violations?

Yes. 4 violations are recorded in open fire inspections, the most recent opened Jul 30, 2026. Source: Residential Fire Inspection Results.

What is being built near 80 Dundas St E?

There are 15 active planning applications within 250 metres (six under review, six under appeal, three approved by the tribunal). The closest is at 50 Gerrard St E, 214 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 80 Dundas St E been renovated?

Yes. The City has 8 building permits on record, 1 in the last 5 years. Source: Building Permits.

Is 80 Dundas St E a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Mackenzie, William Lyon, house, Bond St., w. side, s. of Dundas St. E.
1930 · 25 m awayMackenzie, William Lyon, house, Bond St., w. side, s. of Dundas St. E. Courtesy of Toronto Public Library
Close view of window on Bond Street, north of Dundas Street
1975 · 25 m awayClose view of window on Bond Street, north of Dundas StreetCity of Toronto Archives, Fonds 1526, File 7, Item 95
Bond St Temple - Dundas St view, gargoyles sold
1981 · 25 m awayBond St Temple - Dundas St view, gargoyles soldCity of Toronto Archives, Fonds 1526, File 28, Item 22
View of Dundas Street East looking east from Bond Street
1977 · 25 m awayView of Dundas Street East looking east from Bond StreetCity of Toronto Archives, Fonds 1526, File 71, Item 119
View of demolition of a Lennox building on Bond Street, north of Dundas Street
1981 · 25 m awayView of demolition of a Lennox building on Bond Street, north of Dundas StreetCity of Toronto Archives, Fonds 1526, File 7, Item 100
Mackenzie, William Lyon, house, Bond St., w. side, s. of Dundas St. E.
1953 · 25 m awayMackenzie, William Lyon, house, Bond St., w. side, s. of Dundas St. E. Courtesy of Toronto Public Library
View of Dundas Street East looking west from Bond Street
1977 · 25 m awayView of Dundas Street East looking west from Bond StreetCity of Toronto Archives, Fonds 1526, File 71, Item 120
Bond St Temple at Dundas St
1981 · 25 m awayBond St Temple at Dundas StCity of Toronto Archives, Fonds 1526, File 28, Item 8
View of Ryserson Copy shop at 113 Bond Street, north of Dundas Street
1975 · 25 m awayView of Ryserson Copy shop at 113 Bond Street, north of Dundas StreetCity of Toronto Archives, Fonds 1526, File 7, Item 98

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

80 Dundas St E, Toronto M5B: permits, flood risk and what's planned nearby · My Address in Toronto